Future of Rail (Passenger Experience) 1.30 pm Mrs Louise
Ellman (Liverpool, Riverside) (Lab/Co-op) I beg to move,
That this House has considered the Sixth Report from the
Transport Committee of Session 2016-17, The future of rail:
Improving the rail passenger experience, HC 64, and the Government
Response, HC 905. ...Request free
trial
Future of Rail (Passenger Experience)
1.30 pm
-
Mrs (Liverpool, Riverside)
(Lab/Co-op)
I beg to move,
That this House has considered the Sixth Report from the
Transport Committee of Session 2016-17, The future of rail:
Improving the rail passenger experience, HC 64, and the
Government Response, HC 905.
It is a pleasure, Sir Edward, to serve under your
chairmanship.
Our inquiry into improving the rail passenger experience
started early last year, as the second of a series of five
investigations into the future of rail. We have also looked
at rail technology and rail franchising; we are currently
considering rail safety; and we will complete our rail
inquiries by looking at rail finance and governance.
There is no doubt that the number of people travelling by
train has increased dramatically, which is a real success
story, but what of the passenger experience? Examining this
issue means examining some pretty basic issues. How easy is
it to find and purchase the best-value ticket? How crowded
is the train? Are there enough seats? How clearly is
information presented on websites and apps? Are staff
available to assist people at the station and reassure
passengers about safety? How well does the train company
keep passengers informed about disruption during the
journey? Most fundamentally of all, will the train be on
time? Will it be on time to the station to which the
individual passenger is travelling and not simply on time
at its final destination? We identified many improvements
that are required, and the need for some of them is very
long-standing.
Let us consider the first aspect—looking for and buying the
best-value ticket for a journey. The sheer complexity of
ticketing, with different types of tickets across the
patchwork of operators, has been an issue for far too long.
Ten years ago, the Transport Committee described the
complexity in rail fares as an “insult to the passenger”.
In 2006, the Transport Committee decried the fact that the
situation had been allowed to persist for several years.
Yet last year we found that this fundamental problem had
barely been dealt with and that the situation had barely
changed, beyond some very small improvements. Some
improvements to ticket vending machines had taken place,
for example, but they were small improvements in comparison
with the scale of the problem. Despite in-depth research by
consumer groups and numerous pronouncements by the
regulator—the Office of Rail and Road—and the industry, the
problem persists.
A particularly unfair phenomenon is split ticketing. It is
often possible for passengers who have the knowledge and
time to undertake intricate research to save considerable
sums of money by buying separate tickets for different
portions of the same journey. It was possible to save money
through split ticketing on 33 of 50 cross-country journeys
that were examined by The Times last year, when it
conducted a survey on this problem. This situation is
unsatisfactory and unfair. People can pay as much as £85
more than is necessary for a single train journey, for
example on the service from Penzance to Birmingham. There
is a differential of £85 if someone buys split tickets
rather than just buying one ticket. Further examples can be
found on numerous routes.
Despite the problem having been well understood for a long
time, no one in the rail sector appears to have a grip on
it and no one seems to be responsible for dealing with it.
The Transport Committee has been told on numerous occasions
by a succession of Ministers that this issue will be dealt
with, but nothing has happened and nobody seems to have the
power to enforce any change.
Recently the Department for Transport, together with the
Rail Delivery Group and the regulator, published a plan to
deal with these issues; it contained proposals in December
about certain trials that were to take place. It is unclear
how effective this plan will be and we still do not know
the full details of what these trials will be and where
they will take place. I assure the Minister that, as a
Committee, we will follow this matter up. It is good to
have a plan, but we need to know exactly what it is, how
effective it is and—if it is effective—how it would be
rolled out across the system.
-
(Stoke-on-Trent South)
(Lab)
I congratulate my hon. Friend on securing this debate.
Given that there are some extremely good websites out
there—I have personal experience of using seat61.com and
loco2.com—it is possible, quite straightforwardly, for
someone to work out good rail routes, if they have access
to a computer. So, given that it is possible, why does it
seem so difficult for the Government and the train
companies to resolve this issue, and what about those
people who do not have access to a computer?
-
Mrs Ellman
My hon. Friend makes an excellent point. If somebody has
the time, the knowledge, the ability and the access to the
appropriate technology, they can discover a lot of
information, but it is not available to everyone, and I
find it very surprising that Ministers and the rail sector
as a whole are simply unable to take up this issue and
ensure that information that is technically available is
actually available to the ordinary passenger. That is where
my concern lies and where the Committee’s concern lies.
-
(Stretford and Urmston)
(Lab)
I, too, congratulate my hon. Friend on securing this
debate, which my constituents will follow with great
interest. Does she agree that it is also important that
passengers are able to buy any sort of ticket, particularly
at unstaffed stations, and that one of the urgent
priorities is to make sure that ticket machines are put in
place in all those stations where no staff are present,
including those on the line through Urmston and Trafford
Park, many of which do not have such machines?
-
Mrs Ellman
My hon. Friend makes another excellent point. There is
nothing more frustrating for a passenger than to be told
that tickets are available, only to go along to their local
station and find that that simply is not the case. I say
again that this is a long-standing issue. It is known
about, Ministers are well aware of it, but very little
indeed has been done to resolve it. My hon. Friend has done
a great service to her constituents in drawing attention to
this issue during this debate.
Rail passengers want clear and accurate information about
their journeys. They want information not only on how to go
about their journey and what sorts of journeys are
available but on how a journey is progressing. Too often,
however, that information is simply not being provided.
When we conducted our inquiry and called for evidence, it
came flooding in and we saw that passengers were largely
negative, first about their experience of train operating
companies’ websites. One such website was described by a
passenger as being
“appalling, badly designed, inefficient, difficult to use,
often to the point of being unusable”.
Some smartphone apps seem little better, as they routinely
failed to provide reliable information, for example about
which platform a train will depart from. Once again, that
is basic information and it is galling for passengers to
read reports about systems being put in place, which can
all sound very good. What really matters is what happens to
an individual when they make their journey. That is what
really counts.
It is important that the technology is available and
accessible, but it is also important that people are
actually at hand in stations to give assistance and
information. That help is essential for
everybody—travellers want to see actual people around who
can help them, and give them guidance and information—but
for people who have a disability it is absolutely
essential. Although the systems in place for assisting
people with disabilities to travel by train sometimes work,
there are also occasions when those systems break down,
which is another great concern for us.
Overcrowding is another ongoing concern. It does not happen
everywhere, but where it does happen it is extremely
important and creates major obstacles. Many people told us
that their journeys were uncomfortable. They often worried
about whether they could actually get on the train. Many
were concerned about the potential danger in getting on
very crowded trains, and that is stressful.
-
My hon. Friend is being generous with her time. I had an
email recently from a constituent who is trained in first
aid and who was concerned about a journey from Birmingham
to Wolverhampton; she and others were standing and somebody
fainted so she went to provide assistance. There was not
space for the person to lie down, as is required when
giving first aid to someone who has fainted. When the train
crew got on, they said, “This happens regularly, because
the train is so regularly crowded. We are used to people
passing out.”
-
Mrs Ellman
My hon. Friend draws attention to a situation that is all
too common. If there is sporadic overcrowding, that can
perhaps be coped with, but when it happens regularly, it
requires attention and the situation is not being
addressed. A great deal of the publicity about overcrowding
relates to commuter lines into London, and that is where
most of the overcrowding takes place, but it does not
solely affect London. There is overcrowding on other
routes, too. In Manchester, rush-hour trains are on average
4% over capacity, with 12% of passengers regularly
standing. That is a lot of people, and average figures mask
a lot of difference. The top 10 overcrowded train services
in England and Wales are between 61% and 129% over
capacity. Eight of the 10 most overcrowded services are in
the London area, with two in Manchester, but there are
examples throughout the country. This issue needs attention
and it must not be ignored.
-
(Colchester) (Con)
Will the hon. Lady give way?
-
Mrs Ellman
Yes, I will.
-
rose—
-
(in the Chair)
Order. Normally if a Member wishes to intervene, they
arrive in time for the beginning of the debate. Please
continue, Mrs Ellman.
-
Mrs Ellman
Thank you, Sir Edward. The Department is well aware of this
long-standing problem. It must identify places where
overcrowding has become a persistent serious problem,
making journeys uncomfortable. The train companies, through
the franchise agreements negotiated with the Department,
should be required to identify where there is a serious
problem and take action to alleviate overcrowding on
specific services. I hope that the Minister will confirm
that he is looking at the problem and is proposing action
to address it.
Over the past day or two, there has been a lot of
discussion about the consultation on the Southeastern
franchise, which has rightly raised the big issue of
overcrowding. The consultation puts forward certain
proposals for dealing with the issue, but it is not a
problem just for new franchises; the problem is being
experienced now, and it requires the Department’s
attention. It relates to the train operating companies and
the provision of rolling stock.
I repeat the question that I have asked a succession of
Ministers numerous times in a succession of meetings: who
is responsible for the long-term planning and delivery of
rolling stock? That might sound like a pretty basic,
simple, fundamental question, but I have never received a
straightforward answer; the nearest I have got is something
about “the Department”. I then ask, “Who is it in the
Department? The Minister? The Secretary of State?” Then the
clarity disappears.
When we come across specific issues and problems—there was
one a couple of years ago when a carriage was moved from an
important service in the north to go to the then Prime
Minister’s constituency—Ministers appear to be powerless. I
was told by the then Secretary of State, “It will get
resolved.” It did get resolved, in the end and after a
great deal of fuss, but I still had no answer to the
question of who was actually responsible. The Minister is
very diligent about these matters, so I hope he will be
able to give a clearer answer. Who is responsible for the
long-term planning and delivery of rolling stock, including
new rolling stock and refurbishment?
People are facing a whole range of problems in undertaking
their journeys on rail. Perhaps one constant feature, which
overrides other rail issues, is the constant challenge of
the rail system’s fragmentation. Time and again we come
back to the issue of how the sector will work together more
cohesively to give the best possible service to the
passenger.
The Rail Delivery Group was set up to bring the rail sector
together. Yes, it has made some improvements, but it has
not addressed the basic issues. How will it change the way
it operates? Does it need more powers? Do franchises need
to be different? Should the Department and Ministers act in
a different way? How can the rail regulator be more
effective in taking action? That is not clear. Does the
regulator need more powers? If so, what are they? What
action does the Minister propose to take to make that a
reality? The most disappointing thing about the challenges
that the Committee and I have identified is that most of
them are not new: they are long-standing. Despite the best
efforts of a succession of Ministers and the Department,
not a great deal has changed, and we simply cannot go on
like that.
As our inquiry was under way, a major crisis was developing
on Southern rail, which is part of the Thameslink, Southern
and Great Northern franchise. It is run by the parent
company, Govia Thameslink Railway —known as GTR—but I will
refer to it as Southern, because that is the area in which
the bulk of the problems have arisen and where the bulk of
the difficulties are for passengers.
As we were conducting our inquiry, passengers on the route
were becoming increasingly exasperated and angry that their
rail service, for which many pay several thousand pounds a
year, was inadequate and utterly unreliable. Whether
passengers are paying several thousand pounds a year for a
season ticket or simply paying their fare, they are equally
entitled to have a proper service, but that was not
happening. The situation remains virtually the same, with
passengers suffering mass cancellations and inordinate
delays. People’s jobs have been put at risk, simply because
they cannot get to work on time. Some people reported that
they have moved house because of the problem.
Life has been disrupted. Why? It is a sorry combination of
a too-large franchise, poor management, misjudgment and
disastrous industrial relations, which have conspired to
create an appalling situation for passengers. The ongoing
strikes have compounded a series of errors and
incompetence. Passengers are right to be angry, but the
Department does not seem to be doing much about the
situation except to accept that there is a big problem.
It cannot be acceptable for those responsible for the
problem—not just one party is responsible; responsibility
must be shared by a multiplicity of organisations and
individuals—to fail so comprehensively and for so long and
to appear not to be acting. In 2016 alone, 58,983 train
journeys were partly or wholly cancelled. That is a
tremendous figure. I do not think the travelling public
want to hear all the arguments about who is responsible.
They just know that it is a fact that their lives are still
being disrupted and that nothing much is changing, and they
want something done about it.
The Department has already accepted that the franchise that
was drawn up was much too large. It is the largest in the
country. It is uniquely large; it contains more than a
fifth of all the passenger journeys across Britain’s entire
network. It is too large a franchise, and the Department
has said that that was its mistake.
Add to that the situation on the ground and the complexity
of major infrastructure works planned during the course of
the franchise agreement, including the huge and
logistically challenging Thameslink programme, and there
was a recipe for calamitous passenger experience. The
impact of the Thameslink programme on passenger services
was substantially underestimated. The estimated number of
delay minutes was forecast to be 10,000 per year; the
reality has been 10,000 per week. I ask the Minister how
that estimate could be so disastrously wrong. It has
contributed substantially to the problem.
If we add to those things—too large a franchise and a major
infrastructure challenge, the impact of which was grossly
underestimated—inadequate levels of staffing, the situation
becomes even worse. The industrial action on top of that
has escalated the situation to an unacceptable level.
I mention one other factor; I suspect hon. Members will
find it difficult to believe if they are not already aware
of it. At the very beginning of the franchise, the company
did not have enough drivers to operate the trains. That
part has been rectified—except for the fact that we are now
in a dispute about driver-only operation—but having
insufficient drivers at the beginning of the franchise does
not suggest great competence.
The question for the Department and the Minister to answer
is: what is being done? The franchise was constructed on a
management fee basis, which is currently unique, because of
the anticipated risk. The revenues go directly to the
Government and a fee is paid to the train operator, so
there is no risk in that sense. I have described the nature
of the services and the problems. The train operator
receives an annual management fee of around £1 billion;
probably around £3 billion has been paid out to date. Under
that system, the public purse foots the bill for losses
that occur from lost sales, disruption and passenger
compensation.
I do not have an up-to-date figure of exactly how much has
been lost and how much the public purse will have to pay
out, but the latest figure I have is £38 million and
rising. That was supplied by the Minister in a letter to me
some time ago. Compensation schemes have been announced
since then, and we do not know how they are operating or
how much money is involved. The bill could be increasing
substantially.
To add to the complexity and difficulty, there is the issue
of force majeure, which concerns the dispute—ongoing and
unresolved, as far as I am aware—between the train
operating company and the Department for Transport about
who is responsible for all those cancelled services. Who is
responsible for those 58,983 and more train journeys that
were wholly or partly cancelled? There is an unresolved
dispute between the Department and the train company, with
no end date in sight. That cannot be acceptable. All this
is continuing—passengers are getting more and more angry,
and there is no end date. I hope the Minister can tell us
what is happening and when it will be resolved. The public
also have a right to know what the Department’s plans are
to deal with the situation.
The franchise is due to run until September 2021. I would
not like to anticipate the extent or the level of anger
that passengers are going to be feeling by then if nothing
changes. What is the Department doing? Is it considering
restructuring the franchise—perhaps dividing it up and
allocating different parts to different operators? There is
silence. We simply do not know what is happening. Doing
nothing is simply not enough.
-
My hon. Friend is highlighting well-publicised problems at
Southern Rail. She will know that, in the last few weeks, a
similar dispute began with Northern Rail, which serves both
her constituency and mine. Does she agree that Ministers
need to take action swiftly so that we do not end up in the
long drawn-out and unresolved situation with Northern Rail
that passengers have had to suffer at Southern Rail? Will
she call on the Minister to tell us what swift action the
Government are taking?
-
Mrs Ellman
I agree with my hon. Friend. The issue is escalating and is
now not solely to do with Southern Rail. I hope the
Minister is able to tell us what he and the Department are
doing to deal with this unacceptable situation. However
blame is apportioned, it is the passengers who are
suffering.
I thank the Minister for certain steps that he has taken in
relation to Southern Rail, which have an impact on the rest
of the rail network. The Committee was extremely concerned
to find that the Department was not making information
available about its monitoring of the franchise and whether
contractual benchmarks were being met. After a lot of
pressure from the Committee, the Minister agreed that that
information would be made publicly available as far as it
could be—not simply for Southern Rail, but across the
network for other franchises.
I thank the Minister for responding to our concerns so
swiftly when he realised their extent, but I have to ask
when that information will actually be made available, for
Southern Rail and for franchises in the rest of the
country. It is extremely important that the Department
monitors franchises. Because of its failures, the situation
in the Southern franchise has now reached dramatic
proportions, but there are other issues in other parts of
the rail network and the Department is equally responsible
there. I would like some information on that monitoring.
I have dwelt at some length on what is happening at
Southern Rail because it is such a traumatic, ongoing
event, but also because some of its features can be applied
in other areas. We have major infrastructure works planned
for other parts of the network as well. Will the Minister
ensure that the problems in miscalculations made in
relation to infrastructure on Southern Rail will not be
replicated in other parts of the country when major
infrastructure works take place? That is a very important
question.
It is important to go back to the beginning and ask how we
know what passengers’ concerns are and whether we are
monitoring them properly. The rail sector does have ways of
monitoring passengers’ views. There is an annual rail
passenger survey, and other things are done, but the
Committee felt that they were not really adequate because
some of the information that we picked up from passengers
was not reflected in some of the official statistics that
had been collected. I would ask that that whole system be
looked at again.
Later in this Parliament, we will complete our “future of
the rail” series of inquiries by looking at rail finance
and governance, and how important changes should and can be
implemented. I am in no doubt that the massive increase in
the numbers of people using trains is a success story and I
applaud many of the developments in our rail service. In
many ways, it has been a success—but there are major
problems and issues, and one is the passenger experience.
I have outlined some of the report’s findings today, and I
thank all Committee members, a number of whom are here this
afternoon, for their work and dedication. They looked at
the issue as a whole and have drawn attention to their own
individual information and experience from their role as
constituency MPs. I thank them for that.
We are all working to secure one end: to bring
improvements. I conclude by thanking the Minister for the
attention he has already shown to some aspects of the
issue. However, the Committee would like to know what else
will be done so that passengers’ experience can be
improved, on a growing and increasingly successful railway.
1.59 pm
-
(Cleethorpes)
(Con)
It is a pleasure to serve under your chairmanship, as
always, Sir Edward. I thank the Chairman of the Transport
Committee, the hon. Member for Liverpool, Riverside (Mrs
Ellman), for comprehensively summarising our inquiry. I
would like to focus on two or three things and give one or
two local examples from my constituency of the failure of
both the services and the ticketing arrangements.
The hon. Lady spoke of the dispute on Southern. The only
comment I want to add to that and to what is in the report
is how amazing I find it that we were told by the two
company representatives that there were not enough drivers
to operate the services from day one, due to an unexpected
fall in the number during the change-over of the
franchises. They said that they did not know on day one,
but surely they could not have been so incompetent not to
have known on day one minus 10 or 20.
It is amazing that, on day one, the company should not have
enough staff to operate the services they had committed to.
I do not think we managed to tease this out of the Minister
at the meeting—perhaps we did and my memory is failing
me—but did the Department know that on day one the company
could not provide the services it had contracted for?
The hon. Lady gave many examples relating to ticketing. We
were told how complex it is because there are so many
different routes and tickets, but that applies to many
industries. Why are the ticketing arrangements on the
railways so far behind the airlines, for example? They have
speeded up their process, and it is now pretty easy to
check in and get a ticket. I find it amazing that, after
all this time and so many promises and reports, we are not
able to ensure ease of operation.
The report is about the rail passenger experience, the
first part of which is getting a ticket and getting
information about train times. The hon. Lady gave an
example of different websites giving a ticket price
difference of £80. I did a bit of research this morning on
how to get from my Cleethorpes constituency to
Haverfordwest. Perhaps not a great many people do that
journey, but I happen to have family in Haverfordwest and I
have done it on a number of occasions. Amazingly enough, it
can be done with only one change in Stockport.
I went on the National Rail website. National Rail sounds
important, doesn’t it? People look at it and think, “This
is the Rolls-Royce of websites.” Okay, it has got the
information, but it is, shall we say, variable. When I tap
in, “Cleethorpes to Haverfordwest”, the website says at the
top, “Buy the cheapest for £157”. That is for a single
adult standard class ticket.
Buying a ticket from Cleethorpes to Stockport costs £21.
There are numerous fares at different times of the day to
then go from Stockport to Haverfordwest, but I chose to
leave Cleethorpes at 9.26. I was told that it would be
£157, and that if I went 2 hours later it would be £163.80.
If I go on the 9.26, I pay £21 to get to Stockport and
£44.50 to get from Stockport to Haverfordwest. That is
almost a £100 difference. If a family of three or four do
that, let us be honest, they are being robbed—there is no
getting away from it.
Having gone to south Wales, I thought, “I wonder whether it
is cheaper to get to north Wales,” and I did a similar
exercise going from Cleethorpes to Bangor; I accept that
perhaps not many people do that on a daily basis. Again, I
found that if the journey is done in three stages, it can
be done for £56.20, whereas the headline says, “Cheapest
fare £81.40.”
My final example is to get from Cleethorpes to Felixstowe,
which again I found can be done £15 cheaper than what is
stated at the top of the webpage—mind you, four tickets are
necessary to do that, so perhaps the convenience makes it
worth it. In this day and age, this is not rocket science.
If the railway companies cannot do it themselves, somebody
else should be made to do it on their behalf, and they
should have to pay to have it done.
Obviously, I travel down here from Cleethorpes every week
and back again, and I am always amazed at how many times my
tickets are not checked. There are no ticket barriers at
Cleethorpes or where I change at Doncaster, and at least
50% of the time the barriers at King’s Cross are not
operational. I have done that journey time and again—I
could have saved the taxpayers no end of money if I had
just taken a chance on it, but we are all honest, aren’t
we?
-
I totally support the hon. Gentleman’s comments about
tickets not being checked. The situation is exacerbated
when there is no machine on the station platform and no
staff from whom one can buy a ticket. On my local line,
passengers regularly travel between Urmston and Trafford
Park, for example, without paying—not because they are not
willing to pay, but because there is absolutely no way they
can do so.
-
The hon. Lady is absolutely correct. Seeing you in the
Chair, Sir Edward, reminds me of the journeys that can be
made from Cleethorpes to Lincoln via Market Rasen. There is
often an announcement on the 9.20 train from Grimsby to
Lincoln saying, “This train will be overcrowded when we get
to Market Rasen. Can we get the tickets sorted out
quickly?”
That brings me to overcrowding. You have probably used that
9.20 train yourself, Sir Edward. It leaves Market Rasen at
about 10 o’clock in the morning and delivers you to Lincoln
or Newark, where you can get down to King’s Cross. The
reality is that it is a single unit, and has been one for
years and years, despite the fact that it is regularly
overcrowded when it leaves Market Rasen.
-
Absolutely, and the same is true on the train that runs
through Stoke-on-Trent on the Crewe-Derby line. It is a
single unit and overcrowded, but nothing has been done for
years. Nobody seems to care.
-
I thank the hon. Gentleman for that intervention. As the
hon. Member for Liverpool, Riverside said, there is even a
top 10 of overcrowding. I do not know whether the Market
Rasen service is on it, but it certainly ought to be. The
reality is that it is a single unit. East Midlands Trains
will say, as it has said to me, “There isn’t enough rolling
stock available, even when it cascades down after new stock
has come on,” but that has been the case for 10 years. How
long does it take to produce a new diesel unit to run that
service?
If trains are regularly overcrowded, notwithstanding the
fact that the rail experience is not particularly desirable
from the passenger’s point of view, surely the companies
are falling down on the commitments they made in their
franchises. If they are not falling down on their
commitments, the franchise agreements need tightening up.
Finally—the Minister would not expect me not to mention
this issue; we have spoken about it on many occasions—the
rail experience is much better if people do not have to
change trains and there are through services. British Rail
ended through services from Cleethorpes to King’s Cross in
1992, and it is about time they were restored.
I know the Minister is sympathetic and that you, Sir
Edward, are sympathetic, because you would like through
services to go through Market Rasen and Lincoln as they
used to. It is about time that the Minister made some more
sympathetic noises and guided me through the system, so
that in the not-too-distant future—preferably before the
next general election—we have an absolute commitment to
provide such a service.
2.10 pm
-
(Eltham) (Lab)
I congratulate my hon. Friend the Member for Liverpool,
Riverside (Mrs Ellman) on her introduction to the report
and the Government response. I came on to the Committee
part way through the investigation, but I feel a certain
amount of ownership because in my previous life on the
Select Committee I was involved in the 2006 report. I am
dismayed to be back here still debating exactly the same
things we raised in our report all that time ago.
Before the 1997 general election I went to an event
attended by the comedian and satirist John Bird, back when
rail privatisation was still in its fledgling years. He
said that the rail operating companies had given up calling
people “passengers” because they did not want to give them
the idea that they had any intention of taking them
anywhere. People served by Southern and Southeastern —my
constituents are served by Southeastern—get the impression
that nothing at all has changed since. Things have not
moved on.
The passenger experience is at the heart of what we should
be seeking to achieve in our railways. It is not
satisfactory to say that the railways must be a success
because so many more people are travelling on them. People
travelling on Southern, for example, do so because they
have no alternative but to suffer the service they are
being offered. After all, there are few alternatives for
getting to work other than to suffer that service.
The poor performance of Southern and Southeastern is
exacerbated by the development taking place at London
Bridge. I commend the railway industry for keeping London
Bridge operating while such an incredible feat of
engineering is taking place—to add two additional lines
through so busy a station while keeping much of it
operating is quite an achievement—but that does not excuse
the frequency with which my constituents are inconvenienced
because the infrastructure has broken down, whether it is a
set of points at Charing Cross, London Bridge or Lewisham,
as is frequently the case, or a train that is blocking the
rail. That is too often the experience of the customer.
Recently, quite late one evening, coming back from the
House, I was at Waterloo East and the trains were all
delayed—I cannot remember whether it was a train or the
points on that occasion. A woman standing next to me
shouted across to the central platforms of the station,
trying to get some information from the staff about how she
could get to the station that she wanted to get to. They
were holding their hands to their ears, trying to hear what
she was saying, then a train trundled between them and
stopped at the platform. The woman sauntered off down the
platform and the train left, while the staff kept talking
to each other on the other platform. The impression was
that the staff were so beaten down by the quality of the
service that they had given up making any attempt to assist
passengers.
There is something in that about the quality of the
customer interface; the interaction of staff and passengers
who have been inconvenienced. That needs to be addressed
and the Government should hold the train operating
companies to account for it. It is not good enough to
collect statistics. The companies should train their staff
to react and respond to passengers, in particular when the
service is disrupted, and they should be readily available
to provide prompt advice. Waterloo East station has four
platforms, but on that occasion four members of staff were
all on the two central platforms. Why were they not
deployed to help the customers who needed information?
Southeastern needs a rocket under it to provide better
information. I have other experiences, which I could go
into.
-
I am enjoying my hon. Friend’s contribution. I wanted to
make a point about some of our stations, as I shall very
shortly experience the joys of Euston station, to get back
to Stoke. Why is it, for example, that we are told only 15
minutes before departure which platform our train to Stoke
is to leave from, even though the train has been there for
ages? That sort of thing drives people crazy.
-
My hon. Friend’s intervention is incredibly timely, because
I was about to go on to describe my attempts to get to
Stoke-on-Trent on Virgin Trains on 23 February. I was
fortunate that I did not take the 10.30 am train as my
colleagues had. It had left, but perhaps my hon. Friend the
Member for Stretford and Urmston (Kate Green), who is
present, only got to Stafford at 8 o’clock in the evening,
as my hon. Friend the Member for Greenwich and Woolwich
(Matthew Pennycook) did. He texted me from there; he had
been travelling for more than 10 hours. My train did not
leave at all. I sat there for 45 minutes and finally it was
cancelled, although that turned out to be fortunate,
because I did not end up trapped half way up the country,
nowhere near where I wanted to go.
I then tried to claim my ticket back. I know we are going
to do an inquiry into this, but it too is part of the
passenger experience. As instructed, I went on to the
Virgin website to claim my ticket back, but there was no
facility to say that my train had been cancelled. I was
allowed to say that my train had been delayed, but I was
unable to say that it had been cancelled. Every time I
pressed the button, I was sent back to the beginning, so I
took to Twitter and asked, “Is anyone else having this
problem with Virgin rail?” I am sure because I am a Member
of Parliament and on the Select Committee, I then got
Rolls-Royce treatment—[Interruption.] It was absolutely
Rolls-Royce, because Virgin wrote back to me saying, “Dear
Joseph”, and that they were sorry about my customer
experience. They also sent me half the money and we finally
resolved the matter. The point, however, is that the
experience should not be like that.
In the report one of the online ticketing companies,
Trainline, said that people were uncertain whether they had
bought the cheapest ticket, which was a barrier to some
people choosing to use rail at all. Which companies make
the cost of their product so opaque that it might put
customers off, other than one that has a trapped market and
people who have no choice but to use that service, no
matter how bad it is? We really need to deal with that
customer experience.
My last point is about overcrowding and capacity. I go back
to Southeastern. The figures in the report show that
Southeastern operates an appalling service. It is one of
the worst, and it should be thankful for Southern which
stops it from being bottom of the customer satisfaction
rankings. When we consider that every day so many people in
south-east London rely on that surface rail service to get
to work, and that there is no alternative but road, we
realise what an appalling service it is and what an
appalling and disproportionate impact it has on the lives
of people from that part of London.
Many people think that the whole of London is served by the
underground, but my part of London is well outside the
orbit of the underground, and buses from outer south-east
London take a devil of a time to get into central London.
We rely almost entirely on that commuter rail service, and
it is not acceptable that it is such an appalling
performer. When we do get on trains, they are overcrowded
at peak times because they are not long enough and there
are so few alternatives to that rail service.
We have lengthened the platforms, so let us now lengthen
the trains. We need to ensure that we have the capacity on
Southeastern rail services so that people can get on the
trains at peak time. We need 12-car trains serving the
metro services in south-east London so that constituents
from north Kent and my constituency can get to work
comfortably and on time every day. Thank you, Sir Edward,
for allowing me to make that contribution.
-
(in the Chair)
Order. Mr Quince, I was a bit hard on you. If you wish to
make a comment now, you may.
-
indicated dissent.
2.20 pm
-
(Motherwell and
Wishaw) (SNP)
It is a pleasure to serve under your chairmanship, Sir
Edward. I congratulate the hon. Member for Liverpool,
Riverside (Mrs Ellman) on securing the debate, which I have
found fascinating—I must confess that I did not think I
would. I am pleased to be here to sum up for the third
party in the House.
The hon. Lady was encyclopaedic in her knowledge and
wonderful in explaining the key issues. I will not repeat
each and every one, but she talked about ticketing—as did
the hon. Member for Cleethorpes (Martin Vickers), to whom I
will come in a moment—and that rings all sorts of bells. We
need a method across the entire rail network for getting
the best deal for customers.
At this point, I should declare an interest: I frequently
use the Virgin Trains West Coast, and with my senior
railcard I manage to get some good discounts. However,
because of the nature of how we work in this place, I
cannot always book a ticket when that would be cheapest,
which makes it very expensive.
I totally understand overcrowding on trains. I am fortunate
in that I do not have to commute around London; even though
my claustrophobia is now much better, I do not know whether
I could do it. Sometimes, when I see how bad the tube is, I
am able to step back and wait for 20 minutes until things
calm down, but that cannot be done on a train. I feel very
sorry for people who have to go through that on a daily
basis.
The biggest issue seems to be how the franchises are handed
out. We hear that some franchises were given to operators
who did not have enough drivers—that is a complete
disgrace. As the hon. Member for Liverpool, Riverside said,
passengers should be entitled to a full service, but, if I
picked it up correctly, 58,500 cancellations took place in
a week—not in a year?
-
Mrs Ellman
That was in one year—in 2016, to be specific.
-
I stand corrected. However, in anyone’s book that number of
cancellations is not acceptable. The management fee basis
on which the Southern franchise was put out seems to be
quite a drain on the public purse and something that the
Government should look at as quickly as possible.
-
Did the Scottish National party Government in Scotland
learn anything from the franchising process we have
undergone in England? The passenger survey shows that,
since the Scottish Government privatised the service
to Abellio, satisfaction in the service has
declined, and the service has declined since then. I wonder
whether any lessons—
-
(in the Chair)
Order. I do not think we need to start debating Scottish
railways—unless you really want to, —because I am not sure
they are germane.
-
Perhaps we should. It is important that the Minister hears
how we dealt with these things in Scotland so that he can
take on board some of the things the Government there have
done.
The hon. Member for Cleethorpes gave us an interesting and
humorous list of journeys from Cleethorpes to
Haverfordwest. I really enjoyed that. I could introduce him
to someone I know well who regularly journeys from here in
London to north of Dundee. She is an expert on how to get
the best deal with split ticketing. However, the whole
point is that people should not have to become experts in
that area. There should be a way of simply going on to a
website and finding the cheapest journey as easily as
possible.
The hon. Member for Eltham (Clive Efford) referred to his
time on the Select Committee in a former Parliament and was
disturbed to find that we are still dealing with the same
issues. I know you do not want me to go on for too long,
Sir Edward, so I will not do a full summing up of what
everyone else said, but, for the Minister’s benefit, yes,
there were issues in Scotland over the franchise given
to Abellio, but after much consternation
among passengers, the Scottish Government brought in an
improvement plan and since then things have moved forward.
The score for ScotRail on the passenger satisfaction survey
was at 83%, which was lower than the previous year, but in
the last month or so it has gone back up to about 90%—a
number that many companies and commuters in the south-east
of England would be delighted to have.
The Scottish Government have put more than £5 billion in an
investment programme for the five-year period to 2019. We
will open new stations and build new lines. We see that as
a way to get a greener Scotland and to increase Scotland’s
economic base.
I commend to the House the ten-minute rule Bill that my
hon. Friend the Member for Inverness, Nairn, Badenoch and
Strathspey (Drew Hendry)—I myself have to read his
constituency because it is so vast—introduced in the
Chamber only this week. What we really need in Scotland is
Network Rail to be devolved. The Scottish Government can
take forward many programmes, but ultimately Network Rail
is not devolved, which means it does not have full control
over the rail network in Scotland.
-
(in the Chair)
Order. I know the hon. Lady will want to speak to the
report.
-
Yes, I shall do—I apologise, Sir Edward. It is important
for the Minister to understand that it is possible to
improve things and move them forward. As part of the
process of making things better on the English railways, if
I can put it that way, he may also want to look at taking
powers to nationalise them again, as we did in Scotland, so
that Government organisations and national organisations
could bid for franchises. That happened on the east coast
main line, and it ran very well.
-
(Nottingham South)
(Lab)
I want to come back to the hon. Lady’s point on further
fragmentation of the rail network. How does she feel the
passenger experience of travelling on the railways would
improve if the management of the infrastructure were
further fragmented by having part of it devolved to
Scotland, even though many franchises operate in both
Scotland and the rest of the UK?
-
I thank the hon. Lady for her intervention. I could speak
of a personal constituency issue: there were real
difficulties with the electrification of the Glasgow to
Edinburgh line. Transport Scotland was responsible for part
of it, but some of the issues were being dealt with down
here with Network Rail. That made it difficult to get real
accountability. The Scottish Government wanted to be
accountable for everything, but they could not be because
Network Rail is not devolved. That is why we ask for it to
be devolved.
-
The hon. Lady is being generous with her time in giving
way. When we consider some of the services that operate on
the west coast main line and the east coast main line that
cross the border, does she not accept that it would be even
more difficult to operate a seamless passenger experience
if those operators had to deal with both Network Rail in
England and a separate network rail in Scotland?
-
I see where the hon. Lady is coming from, but no, I would
not agree with that; at the moment it is working well. I
see no reason why the Scottish Government would make life
difficult for Network Rail in England, Wales and Northern
Ireland. I am sorry, but I cannot agree with her on this
occasion.
I will end there, Sir Edward; thank you for the
opportunity.
2.30 pm
-
(North West Durham)
(Lab)
It is a pleasure to serve under your chairmanship, Sir
Edward. I thank the Transport Committee for its excellent
report. It sets out the details very clearly and is also
readable, which is great. I am grateful that it focuses on
passengers. We hear so much about train operating
companies, Network Rail and the Department for Transport,
but the report focuses on passengers and their experiences.
They are the bottom line and the end receivers of all of
this.
I will briefly say something about Select Committees. In my
first five years in Parliament I was a member of the
Education Committee. In my experience, Select Committees
work really hard and their reports are full of good
analysis, hard work and excellent recommendations.
Governments do not generally take up those recommendations
immediately, but over a period of two or three years, they
tend to drip into manifestos and legislation. I therefore
give credit to the Minister; I think he has accepted all of
the report’s recommendations in full or in part, which I
think says something about the report’s excellence. On the
recommendations that he has accepted in full, given the
Department for Transport’s history, can we not have a long,
protracted period of announcement after announcement and
just get on with delivering on them?
The bottom line and the reason for the series of five
reports, of which this is one, is that rail passengers in
the United Kingdom pay some of the highest fares in Europe
and receive a poor, and in some cases very poor, service in
return. In January this year, rail fares again rose above
the rate of inflation, at a time when many commuters face a
daily struggle to and from work to get there on time or to
get there at all. That is down to the poor and
deteriorating performance of train operating companies—not
all of them, but far too many. While we in here might
debate the high-level stuff about who should run the
railways—whether it should be the market, whether it should
be publicly owned and so on—rail passengers I speak to do
not really care about that. They want an efficient,
effective, affordable and accessible railway system. That
is not what they are getting at the moment.
Given that the Government accept 13 of the recommendations
in full and six in part, and do not disagree with any of
the Committee’s recommendations, I will focus on the areas
for which the Government only partially accept the
recommendations. I ask the Minister to look again at the
Government’s responses to the Committee’s criticisms and
the recommendations that they have not wholeheartedly
accepted. As the Committee forcibly points out, passenger
experience, particularly and especially on the Thameslink,
Southern and Great Northern franchise, has been “woeful”.
It puts that down to
“inadequate planning, weaknesses in the franchise handover
process, infrastructure and rolling stock failures,
mismanagement, poor industrial relations”.
The report states that the Department for Transport must
“get a grip”. It actually says that, and I think anyone who
has ever travelled on that franchise would agree. I
recently took a journey on that franchise. I am from the
north-east and do not normally travel on Southern, but I
thought I should experience these things if I was to talk
about them, so I did. I travelled down to Brighton and came
back in the rush hour, and it was absolute hell; it beggars
belief that people have to pay enormous amounts of money to
endure that daily hell.
In the light of the report, the Department for Transport
can no longer claim that no operator could do a better job
than TSGN; in fact, it is hard to see how any operator
could do a worse job. However, the whole blame does not
rest solely with that train operating company. A lack of
transparency over performance against contractual
obligations is down to the Department for Transport. A lack
of publicly available data for monitoring is down to the
Department for Transport. A woefully inadequate franchise,
including lack of proper information at the time of the
bidding process, is down to the Department for Transport.
Even, as we have heard, the lack of drivers at the start of
the franchise is down to the Department for Transport in
part. Anyone who has ever run a company, public
organisation or any kind of organisation knows that there
will be significant staff wastage at a point of change,
including in a handover period. Staff will take the
opportunity to move on to other companies or jobs or to
retire. Anyone who does not take account of that is quite
frankly negligent. I think that is down to the Department
as well as the train operating company. The failure to
address that demonstrates a gross lack of knowledge or
experience, insufficient due diligence or a lack of care on
behalf of both the Department and the franchisee—or
probably a combination of all of those factors.
Current and deteriorating industrial relations issues
clearly have a part to play in this. The Committee is
absolutely right to point out that those disputes can
ultimately be resolved only through negotiation between
Govia Thameslink Railway and the National Union of Rail,
Maritime and Transport Workers. However, given the
Department for Transport’s unusually direct involvement in
that franchise, it should take greater responsibility for
fostering productive negotiations. The Secretary of State’s
current Pontius Pilate-like handling of this is simply not
good enough; this is the Government’s business and the
Secretary of State has to get involved, not least to stop
the dispute from spreading any further. He owes that to
passengers. The dispute is not insolvable. The Government
need to get the parties together and take a lead. The
alternative is that it spreads across the country, as we
are beginning to see now, with more and more franchises and
passengers becoming involved.
We have heard a lot about Scottish rail and all its
difficulties, which I accept entirely. There was a
ten-minute rule Bill yesterday about handing over Network
Rail to the Scottish Government; given that they have done
such a cracking job of everything else that has been
delegated to them, as somebody who lives on the east coast
I think it would be an act of negligence for the Government
to do so. However, I have to give credit where it is due,
even though I dislike doing so: this dispute has been
solved in Scotland. The roof did not cave in and the world
did not come to an end; it was simply solved. If they can
solve it in Scotland, we can solve it here. It needs some
Government will and a bit of heavy lifting on all sides.
The Minister will expect me to say something on
recommendation five of the report and the impact of
driver-only operation on disabled people’s
access—particularly in relation to “turn up and go”. The
Committee asks for research to be undertaken into the
potential impact of DOO on disabled passengers and for the
Department to use that research to issue guidance to train
operating companies to help them mitigate potential
detrimental effects on disabled passengers; in other words,
to make the reasonable adjustments they need to make under
the law. That is reasonable and is the very least the
Government could do.
Before I came to this place, I worked with disabled young
people in education. I know how hard their lives are, and
while I was not always able to give them everything that
they wanted, I spent a great deal of time trying to give
them what they needed. I know that a great deal can be done
to mitigate detrimental effects with technology and through
equipment, but ultimately, my experience is that it always
comes down to the intervention of people. To pretend
otherwise is simply disingenuous. Providing more accessible
trains and buses is good. Providing audible and visual
displays is good. Providing an ombudsman is good, although
disabled passengers tell me that they do not want an
ombudsman who will bung them a few quid a year or several
months after an event. They want to be able to travel, as
we all do, when they need to and with dignity, and unless
the Department for Transport or the train operating
companies demonstrate to them otherwise, that will mean a
person other than the driver on the train or the platform
to assist them.
I have always thought that the role of Government is to
ensure that as we move forward no one is left behind.
Frankly, if Government do not believe in that, they do not
have a right to call themselves a Government; they are
nothing other than a special interest group. Disabled
passengers are not asking a great deal. They simply want to
be able to travel when they need to, and with dignity, and
that requires people.
The strength of this report is that it is not about the
Department for Transport, the train operating companies or
Network Rail but about the passengers, who are currently
being woefully let down. I thank the Select Committee for
that.
2.40 pm
-
The Parliamentary Under-Secretary of State for Transport
(Paul Maynard)
It is a pleasure to serve under your chairmanship, Sir
Edward. I congratulate the Chairman of the Select
Committee, the hon. Member for Liverpool, Riverside (Mrs
Ellman), on securing the debate, and all the Committee
members who have attended it as well as the other hon.
Members who have participated in it.
I am pleased that the hon. Member for Motherwell and Wishaw
(Marion Fellows) has, to her surprise, enjoyed the debate.
Let me warn her to be careful: rail is a very seductive and
addictive issue. Transport was my first Select Committee,
and look what has happened to me. I put it down to the good
stewardship of its Chairman that I am where I am today, so
the hon. Member for Motherwell and Wishaw should watch out
for what might occur, either here or in Edinburgh—who
knows?
I thank the Select Committee for its report, which is of
the usual high standard. As has been suggested, I take
these reports very seriously indeed. I know how much work
goes into compiling them, cross-examining witnesses and
drawing sensible conclusions, so I never take any report
such as this lightly.
Much of the report came from an evidence session that I did
on, I think, day three of being in my current role. I was a
little petrified, to say the least, but the report reflects
what I said, and I stand by every word of it. However,
since that appearance, my knowledge has developed a
bit—thank goodness—and of course the circumstances that we
are addressing on the railways have changed. I want to use
this opportunity to discuss some of the recommendations in
the report, as well as the points made today by my hon.
Friend the Member for Cleethorpes (Martin Vickers), the
hon. Member for Eltham (Clive Efford) and the Opposition
Front-Bench spokesman, the hon. Member for North West
Durham (Pat Glass).
One important point made—by the hon. Member for North West
Durham, I think—was that actions speak louder than words.
We can all agree to specific points in reports and so on,
but what matters is actions. Ticketing reform is a good
case study for that. I remember when we looked at ticketing
reform in the Select Committee—I think that was in 2012.
There was a big, thick, wodgey Government document—I think
it was about 200 pages in two sections—with everything that
they were going to do to reform ticketing and make it all
work fine on behalf of the consumer. Nothing ever happened
with that. I got it out soon after my appointment as a
Minister and reread it, thinking, “Maybe there are some
clues in here.” And I thought, “Well, I’m not going to
repeat that mistake.”
In my first week as Minister, there was a significant news
story about split ticketing on the front page of The Times.
I immediately sat down with my officials and said, “Right.
Passenger experience has to be the key issue that we focus
on,” and everyone said, “Okay, how do we define passenger
experience?”, because in a sense, as we have heard today,
it means everything.
Passenger experience is every single interaction between a
customer who wants to travel by train and the train
operators. It is quite hard to segment down, but segment we
must, so when it came to my recent fares and ticketing
action plan, I did not want just a list of actions that I
wanted the industry to take at some future date. I wanted
quite specific itemised actions, with a delivery
date—because delivery dates are often quite rare in these
action plans—that we could hold the industry and, indeed,
the Department to account on. As the Minister, I could then
start to measure whether we were achieving those goals.
Just this week, for example, I was pleased to note that the
Rail Delivery Group has changed its rules on how those who
leave their railcards at home are compensated. Gradually,
slowly but surely, the ticketing action plan is coming into
effect; that is happening as rapidly as possible. I find
that all too often the greatest hurdles relate to system
change—programming the computers and ensuring that each
computer can speak to every other computer, so that we can
then get the outcomes we want.
A large number of comments today and, indeed, the bulk of
this report, focused on the issues involving GTR. I know
that the Select Committee has taken a close interest in
that matter, so I want to try to address it. It will come
as no surprise to those gathered here today when I say that
the performance of GTR is not good enough. It continues to
be not good enough; I continue to be dissatisfied. I expect
GTR to run a timely, reliable and predictable service for
passengers, but I will only ever look at changes to that
franchise arrangement if that delivers an improvement on
behalf of passengers and is not merely for the sake of
structural change.
The report highlighted the fact that we did not wholly
accept the case that someone might do a better job. I
entirely accept, philosophically, that yes, someone one day
might be able to do a better job. My concern at the moment
is to ensure that there is not a severe deterioration in
provision because of yet another handover in franchise
operator. We need to evolve this franchise into a much
better place.
-
I understand that, but where is the point at which the
Minister says, “This far and no more. We cannot any longer
carry on with a franchise that is failing again and again”?
-
The hon. Lady makes a fair point. I do not think that it is
for me as a Minister to say that there is a specific target
that must be hit. What I expect GTR to be doing on a
regular basis is seeking to improve performance, and I will
talk the hon. Lady through what I expect GTR to do.
The punctuality of services operated by GTR was at 73.1%
over the 12 months to 4 March 2017. That compares
significantly unfavourably with the London and south-east
average of 85.2%. No one can pretend that it is anything
other than simply unacceptable. It is despite the
establishment of joint industry recovery plans. None the
less, we are doing everything we can to improve the
situation.
The Chairman of the Select Committee rightly raised the
issue of force majeure. This has been one of my bugbears as
Minister for many months now. Indeed, my enthusiasm for
solving it rather overcame established procedure in terms
of how we go about that. I am pleased to report to hon.
Members that we have now completed assessing six full
periods of GTR’s performance.
The quality of the data has significantly improved,
allowing us to make swifter judgments, but because what we
are discussing is a contractual obligation, GTR has the
right, if it disagrees with the Department’s findings, to
challenge those findings. That is what we are still stuck
in at the moment. I aspire to bring that to a conclusion as
rapidly as possible. I share the undoubted enthusiasm of
the hon. Member for Liverpool, Riverside for putting that
particular aspect of GTR’s performance behind us, but sadly
I am not yet in a position to do that.
None the less, I am still trying to get Network Rail and
the train operators to improve their focus on industry
performance outputs. They are concentrating on three key
workstreams to deliver improvements across the south-east.
The first is the 2018 timetable specification, which will
be crucial to increasing capacity across the south-east.
The second is a back-to-basics approach—ensuring that
trains are on time and correct processes are being followed
and, in particular, focusing on the peaks in the morning
and evening. We have found time and again that when
something goes wrong on this network, what is called the
perturbation and the consequential delays are significant.
I remember that in my first week, we had a sinkhole at
Forest Hill—it no doubt delayed the hon. Member for Eltham
on his way back to his constituency. That was an example of
how something that simply could not be expected caused
significant delays. It is really important that both the
train operator and Network Rail work much more closely
together to ensure that they recover from these problems
when they occur, rather than allowing them to cascade
throughout the timetable.
That is why it is important that the Department as a whole
works with all the industry stakeholders to find new ways
to measure performance that are more closely aligned with
what passenger themselves experience day to day. That is
why we are looking at improving our measurement of what is
called right-time departure and right-time arrival. A
passenger judges whether a train is on time by whether it
arrives at the time said in timetable, and not within five
to 10 minutes. Right-time departure is going to be a much
more important figure in years to come, rather than the
old-style public performance measure. I want to bring that
change in as part of control period 6.
We also want to make sure that, as the hon. Member for
North West Durham mentioned, there is much greater industry
transparency on train service performance levels across
franchises. I am absolutely committed to a much greater
degree of transparency; none the less, it is a difficult
process to engineer—if only because every single franchise
has a slightly different set of measurements, which are
contractual obligations in respect of the individual train
operating companies. That work is ongoing within the
Department; it cannot come soon enough, in my view. I hope
to make announcements in due course—as we always say in
civil service parlance—and am very eager that we keep the
pace going on it.
Many Members mentioned whether the company had a full
complement of drivers on day one when they took over the
franchise. I was not the Minister at the time, but I
understand that part of the problem was that when the deal
was announced it said it did have enough drivers, but, when
it came to mobilisation day, some of those drivers had left
to work in the freight sector. It is entirely right and
proper that we express concerns as to how that gap occurred
between those two points, but we need to take a wider look
at driver recruitment across the industry as a whole.
We all know that there are skills issues across the rail
sector. We have an ageing workforce and a large number of
workers who are about to retire. Are we doing everything we
can to make sure that we are recruiting enough drivers,
that driver training is an efficient process and that
people have the option of going through driver training
themselves—as HGV drivers do—to seek employment somewhere
else? Are we making full use of all the training facilities
that we now have around the country, which I am sure the
Select Committee has visited? We are in close talks with
the Rail Delivery Group about how we can improve driver
training as a whole to improve the throughput, make sure it
meets the needs in the here and now and get the numbers we
need.
Many have mentioned the industrial relations problems
currently on the network. I am as frustrated as everybody
else at seeing yet more RMT strikes this week, but it is
clear that they are now having very little impact on the
network. Last Monday, 90.5% of Southern services ran. Any
strike is frustrating for passengers, but I say to the RMT,
“Your strikes on Southern are not having the impact you
desire. It is far better that you cease industrial action
and have talks with the company, rather than persisting
with the strikes.”
-
I am somewhat concerned about the complacency of that
statement. Industrial action is spreading—as we heard, it
is now in Merseyrail and Northern—and if the Government do
not take action, it will spread right across the country.
-
I take the hon. Lady’s point that it is spreading, but we
remain open to talking to the RMT if it calls off its
industrial action. That is the blockage that stops it from
having a discussion with the Government and the various
train operating companies. Nobody is losing their job;
nobody is losing any pay. The independent regulator has
found that the system on Southern can be safe, and GTR is
taking all necessary action to ensure that it is delivered
safely. I welcome yesterday’s renewed agreement between
ASLEF and GTR. I gather it will now go to a ballot of ASLEF
members; I hope that they endorse it, and that it then
ensures we can focus on delivering improved services across
the Southern network.
We are working to improve the service for GTR customers and
improve compensation measures. Overall, “delay repay”
payments totalled £3.2 million in the last period, of which
£175,000 were “delay repay 15”. We have also launched our
special one-off form of compensation, the equivalent of a
month’s free travel, for all Southern season ticket
holders. GTR has handled almost 37,000 special claims in
that regard, totalling £8.84 million in compensation. The
scheme closes on 30 April 2017, and we continue to
advertise it—as does GTR—in the media, on posters at all
Southern stations, on electronic billboards, in customer
service announcements and on Twitter.
Please be assured that I stay in touch with people on the
situation by having regular meetings with GTR’s chief
executive officer and chief operating officer to discuss
all the issues. They include compensation and the
implementation and progress of all the Government-funded
schemes under both the £20 million that was initially given
out, and the current £300 million that will go on improving
the Balcombe tunnel, removing vegetation and ensuring
greater reliability.
I have five minutes remaining. As ever, how can one discuss
everything about rail in the time allowed? Indeed, it is
even less than that because I have to give the Select
Committee Chairman a chance to have her say. I will briefly
deal with accessibility, which is a mutual concern for both
myself and the Labour party spokesman, the hon. Member for
North West Durham.
It goes without saying that we want everybody to have equal
access to transport. We have committed more than £400
million through Access for All funding and other means to
improve accessibility, and train companies have to comply
with the Equality Act 2010. However, I think the real
picture is the fact that more and more disabled people are
seeking to travel by train. The challenge for the train
operating companies is getting harder with every passing
month.
In the past year, we have seen 4% more sales of the
disabled persons railcard and 7% more bookings under the
passenger assist scheme. With more disabled people
travelling, train operating companies have an ever
decreasing margin for getting it wrong. I welcome the fact
that the Rail Delivery Group is trying to merge the ticket
reservation system and the passenger assist reservation
system by December 2018, although I query whether that is
soon enough and whether it could do more to bring that
forward.
I remind all train operating companies that they must
ensure that procedures are in place to enable disabled
passengers and persons of reduced mobility to board a train
in service that is under the sole operation of the driver.
Where that occurs, I want to see a second person on board
or on the platform to render help to those passengers who
need it most. The key difference is that I do not believe
that that person should be safety-critical. I do not think
it is acceptable to have a situation where a train is
cancelled and a disabled passenger cannot depart the
station in the first place because there is not a second
person on that train. It is fair to say that that is a
small difference between myself and the hon. Lady.
Regardless of whether such assistance has been pre-booked,
the principle of a “turn up and go” railway is important
and must become more important in the future. It will
include the requirement for all train operating companies
to provide appropriately trained staff to meet their
obligations. I see that as meaning more staff required on
the railways, and more passenger-facing staff—not locked
behind a door focusing on buttons—engaging with passengers
on a regular basis. In addition, if a disabled passenger is
unable to access a station, the operator must provide
alternative transport—usually an accessible taxi. That will
require much more cross-Government work to ensure that we
have a greater supply of accessible taxis.
I am conscious that the Chairman of the Select Committee
needs to say a few final words, so I shall leave my remarks
there.
2.58 pm
-
Mrs Ellman
I thank the Committee and hon. Members present for their
valuable contributions. The Minister clearly has an
understanding of these issues, and I like to think that he
received his training when he was a member of the Transport
Committee in previous years.
-
Yes, I did.
-
Mrs Ellman
The Minister spoke about the importance of having a delivery
date. It is vital that we have an early delivery date for the
improvement of the passenger experience, and I assure him
that we will continue to pursue that aim.
Question put and agreed to.
Resolved,
That this House has considered the Sixth Report from the
Transport Committee of Session 2016-17, The future of rail:
Improving the rail passenger experience, HC 64, and the
Government Response, HC 905.
|