|
Field Name
|
Operator at approval
|
Operator following licence / company change
|
Main installations decommissioned
|
Approved option
|
Year of approval
|
|
Huntington
FPSO (Voyageur Spirit) (PDF, 1.19MB, 21
pages)
|
Premier Oil E&P UK Limited
|
-
|
FPSO
|
The Huntington FPSO (Voyageur Spirit) is to be
floated off station and redeployed
|
April 2020
|
|
Pipelines
|
The risers, PL2805 (ident 2), PL2806 (ident 3),
PL2807 (ident 2), PL2808 (ident 2) and PL2809
(ident 2) and mooring system will be removed and
taken to shore
|
April 2020
|
|
Caister -
CDP1a (PDF, 2.93MB, 49
pages)
|
Chrysaor Production (U.K.) limited
|
-
|
Topsides and Jacket and associated sections of
pipeline risers attached to the Caister platform
|
Removal to shore for recycling or re-use
|
March 2020
|
|
Alma &
Galia DPs (PDF, 4.34MB, 61
pages)
|
EnQuest Heather Limited
|
-
|
FPSO
|
Removal to shore for recycling.
|
March 2020
|
|
Subsea Installations
|
Partial removal of the mooring anchor piles. The
mooring chain will be cut locally to the mooring
pile and buried to 1m below seabed. Removal of
manifolds and wellhead protection structures.
|
March 2020
|
|
Pipelines
|
Removal to shore.
|
March 2020
|
|
Brent
Field Pipelines (PDF, 4.05MB, 130
pages)
|
Shell U.K. Limited
|
-
|
Pipelines
|
Removal to shore for recycling/disposal,
trench/backfill, buried pipelines left in situ
|
March 2020
|
|
Thistle
COS Tanks (PDF, 3.34MB, 59
pages)
|
EnQuest Heather Limited
|
-
|
Crude Oil Storage Tanks
|
Removal to shore for recycling
|
January 2020
|
|
Banff SAL
Buoy (PDF, 996KB, 20
pages)
|
CNR International (U.K.) Limited. Decommissioning
Programmes submitted by Teekay Petrojarl Floating
Production UK Ltd.
|
-
|
Subsea installations
|
Removal to shore for either re-use or recycling
|
November 2019
|
|
Pipelines
|
Part of pipeline to be returned to shore for
recycling
|
November 2019
|
|
MacCulloch
Decommissioning Programmes (PDF, 1.36MB, 40
pages)
|
Chrysaor Production (U.K.) Limited
|
-
|
Subsea installations
|
The anchors will be decommissioned in situ. All
other installations will be removed to shore for
either re-use or recycling
|
November 2019
|
|
Pipelines
|
Removal to shore for either re-use or recycling
|
November 2019
|
|
Goldeneye (PDF, 3.41MB, 53
pages)
|
Shell U.K. Limited
|
-
|
Topsides and Jacket
|
Removal to shore for re-use or recycling
|
November 2019
|
|
Pipelines
|
Sections of pipelines from the Goldeneye Platform
up to but excluding the main pipeline tie-in
flanges – removal to shore for re-use or
recycling
|
November 2019
|
|
Brae Alpha
West Drilling Rig (PDF, 2.2MB, 24
pages)
|
RockRose Energy UKCS8 LLC
|
-
|
Drilling Rig
|
Removal to shore for recycling or disposal
|
September 2019
|
|
South
Morecambe DP3/DP4 (PDF, 2.72MB, 57
pages)
|
Spirit Energy Production UK Limited
|
-
|
Topsides and Jackets
|
Removal to shore for either re-use or recycling
|
September 2019
|
|
Pipelines
|
Buried and stable pipelines left in situ, exposed
pipeline ends cut and recovered to shore for
either re-use or recycling
|
September 2019
|
|
Pickerill
A&B Installations (PDF, 1.79MB, 54
pages)
|
Perenco Gas (UK) Limited
|
-
|
Topsides and jackets
|
Removal to shore for re-use, recycling or
disposal
|
September 2019
|
|
Minke
Decommissioning Programmes (PDF, 8.56MB, 59
pages)
|
Neptune E&P UKCS Limited
|
-
|
WHPS
|
Removal to shore for re-use or recycling
|
September 2019
|
|
Pipelines
|
buried sections of pipelines to be decommissioned
in situ small surface laid sections of pipelines
to be removed to shore for re-use or recycling
|
September 2019
|
|
Ketch (PDF, 2.65MB, 60
pages) Schooner (PDF, 4.97MB, 63
pages)
|
DNO North Sea (ROGB) Limited
|
-
|
Topsides, jackets and subsea installation
|
Removal to shore for re-use, recycling or
disposal
|
August 2019
|
|
Pipelines
|
Trenched and buried and left in situ
|
August 2019
|
|
Juliet (PDF, 6.16MB, 47
pages)
|
Neptune E&P UKCS Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
August 2019
|
|
Pipelines
|
Removal to shore for small surface laid sections
of the pipeline and umbilical for either re-use
or recycling; buried sections to be left in-situ
|
August 2019
|
|
Dunlin
Alpha to Cormorant Alpha Pipeline -
PL5 (PDF, 4.36MB, 73
pages)
|
Fairfield Betula Limited
|
-
|
Pipelines
|
Trenched sections will be left in situ, exposed
pipeline ends cut and recovered and severed ends
rock dumped
|
July 2019
|
|
Ninian
Northern Platform (PDF, 2.34MB, 70
pages)
|
CNR International (U.K.) Limited
|
-
|
Large Steel Platform
|
Topsides and jacket to top of footings to be
removed to shore for recycling/disposal. Footings
to remain in situ.
|
June 2019
|
|
Nevis
N11 WHPS (PDF, 1.66MB, 26
pages)
|
Apache Beryl I Limited
|
-
|
Nevis N11 WHPS
|
Removal to shore for re-use or recycling
|
June 2019
|
|
Dunlin
Alpha Topsides (PDF, 4.97MB, 44
pages)
|
Fairfield Betula Limited
|
-
|
Dunlin Alpha Topsides
|
Removal to shore for recycling or disposal
|
May 2019
|
|
Hewett (PDF, 1.5MB, 21
pages)
|
Eni Hewett Limited
|
-
|
Vent Stack (2 x 19m pipes) & other
preparatory works on 48/29B Platform & PL84
|
Removal to shore for recycling or disposal
|
April 2019
|
|
Pickerill
A & B (PDF, 1.26MB, 21
pages)
|
Perenco Gas (UK) Limited
|
-
|
Telecommunication towers, sub-cellar deck
equipment, appurtenances, caissons, associated
tanks and lift pumps, supply hoses, a pipeline
riser emergency shutdown valve and tertiary
steelwork
|
Removal to shore for reuse, recycling or disposal
|
March 2019
|
|
Curlew B,
C and D (PDF, 2.4MB, 61
pages)
|
Shell U.K. Limited
|
-
|
FPSO
|
Removal to shore for recycling/disposal
|
March 2019
|
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
March 2019
|
|
Pipelines
|
Removal to shore for either re-use or recycling;
buried pipelines to be left in-situ
|
March 2019
|
|
Viking
Platforms, Vixen and associated Pipelines
(VDP2) (PDF, 33.3MB, 84
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
Viking Satellites KD, LD, AR, Viking Bravo Hub
BA, BC, BP, BD and Vixen sub-sea tieback
|
Removal to shore for re-use, recycling or
disposal
|
January 2019
|
|
Pipelines
|
Decommissioned in situ
|
January 2019
|
|
Victor
(VDP3) (PDF, 21.1MB, 55
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
Victor Platform and subsea installation
|
Removal to shore for re-use, recycling or
disposal
|
January 2019
|
|
Pipelines
|
Decommissioned in situ
|
January 2019
|
|
Tyne South
Installations (PDF, 1.83MB, 42
pages)
|
Perenco UK Limited
|
-
|
Topsides, jacket and subsea installation
|
Removal to shore for reuse, recycling or disposal
|
January 2019
|
|
Guinevere
Installation (PDF, 2.05MB, 43
pages)
|
Perenco UK Limited
|
-
|
Topsides and jacket
|
Removal to shore for reuse, recycling or disposal
|
January 2019
|
|
Beatrice
Decommissioning Programmes (PDF, 4.45MB, 88
pages)
|
Repsol Sinopec Resources UK Limited
|
-
|
Beatrice AP Topsides; AD, Bravo and Charlie
Platforms and AD Drilling Template
|
Removal to shore for re-use/recycling
|
January 2019
|
|
Pipelines
|
Buried pipelines will be left in situ.
Remediation for any exposed sections.
|
January 2019
|
|
Bains
Decommissioning Programmes (PDF, 2.57MB, 36
pages)
|
Spirit Energy Production UK Limited
|
-
|
Subsea Installation
|
Removal to shore for re-use/recycling
|
January 2019
|
|
Pipelines
|
Decommissioned in situ
|
January 2019
|
|
Jacky (PDF, 2.34MB, 52
pages)
|
Ithaca Energy (UK) Limited
|
-
|
Wellhead Platform and Midline Tee Structure
|
Removal to shore for either re-use or recycling
|
October 2018
|
|
Pipelines
|
Pipelines are trenched and buried and will be
left in situ
|
October 2018
|
|
Brae Bravo
Topsides, Flare Bridge, Flare Tower and Flare
Jacket and Substructure (PDF, 4.9MB, 52
pages)
|
Marathon Oil UK LLC
|
-
|
Brae Bravo Topsides, Flare Bridge, Flare Tower
and Flare Jacket/Substructure
|
Removal to shore for either re-use or recycling
|
August 2018
|
|
Brent
Alpha, Bravo and Charlie
Topsides (PDF, 3.34MB, 81
pages)
|
Shell U.K. Limited
|
-
|
Brent Alpha, Brent Bravo and Brent Charlie
Topsides
|
Removal to shore for recycling/disposal
|
August 2018
|
|
Stirling
A33 WHPS Decommissioning
Programme (PDF, 1.13MB, 27
pages)
Stirling WHPS Close
Out Report (PDF, 2.57MB, 15
pages)
|
Premier Oil E&P UK Limited
|
-
|
Subsea installation
|
Removal to shore for recycling
|
May 2018
|
|
Ann and
Alison (PDF, 2.98MB, 60
pages)
|
Spirit Energy North Sea Limited
|
-
|
Subsea installations
|
Removal to shore for either re-use or recycling
|
April 2018
|
|
Pipelines
|
Buried and stable pipelines left in situ. Surface
laid pipelines removed to shore for re-use or
recycling
|
April 2018
|
|
Saturn
(Annabel) (PDF, 2.49MB, 47
pages)
|
Spirit Energy North Sea Limited
|
-
|
Subsea installations
|
Removal to shore for either re-use or recycling
|
April 2018
|
|
Pipelines
|
Buried and stable pipelines left in situ. Surface
laid pipelines removed to shore for re-use or
recycling
|
April 2018
|
|
Audrey (PDF, 2.87MB, 58
pages)
|
Spirit Energy North Sea Limited
|
-
|
2 fixed platforms
|
Removal of topsides and jackets to shore for
recycling or disposal
|
April 2018
|
|
Pipelines
|
Buried and stable pipelines decommissioned in
situ. Surface laid pipelines removed to shore for
re-use or recycling
|
April 2018
|
|
Rev
Decommissioning Programme (PDF, 12MB, 42
pages)
|
Repsol Norge AS
|
-
|
Pipelines
|
Fully buried and stable pipeline to be left in
situ. All other pipelines to be removed. All
mattresses on pipelines to be removed
|
April 2018
|
|
Markham
ST-1 (PDF, 2.39MB, 49
pages)
|
Centrica Production Nederland B.V.
|
-
|
Fixed Platform
|
Removal to shore for either re-use or recycling
|
February 2018
|
|
Pipelines
|
Two pipelines to be decommissioned in situ
|
February 2018
|
|
Osprey (PDF, 3.92MB, 68
pages)
|
Fairfield Fagus Limited
|
-
|
Subsea Installation
|
Removed and recovered to shore for
recycling/disposal
|
December 2017
|
|
Pipelines
|
Full removal with the exception of the Bundles,
Umbilical Risers within the Dunlin Alpha Concrete
Gravity Based Structure or those trenched and
rock dumped
|
December 2017
|
|
Merlin (PDF, 2.97MB, 56
pages)
|
Fairfield Fagus Limited
|
-
|
Subsea Installation
|
Removed and recovered to shore for
recycling/disposal
|
December 2017
|
|
Pipelines
|
Full removal with the exception of trenched and
rock dumped Pipelines and Umbilicals and
Umbilical Riser within the Dunlin Alpha Concrete
Gravity Based Structure
|
December 2017
|
|
Dunlin
Fuel Gas Import (DFGI) and Dunlin Power Import
(DPI) (PDF, 3.48MB, 54
pages)
|
Fairfield Fagus Limited
|
-
|
Subsea Installation
|
Removed and recovered to shore for
recycling/disposal
|
December 2017
|
|
Pipelines
|
Full removal with the exception of trenched and
buried Pipelines and Rigid Riser and Riser Cable
within the Dunlin Alpha Concrete Gravity Based
Structure
|
December 2017
|
|
Viking
Satellites CD, DD, ED, GD, HD
Pipelines (PDF, 6.77MB, 32
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
Pipelines
|
All pipelines and associated mattresses to remain
in situ
|
November 2017
|
|
LOGGS
Satellites Vulcan UR, Viscount VO, Vampire OD -
LDP1 (PDF, 17.5MB, 61
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
3 x fixed platforms - Vulcan UR, Viscount VO and
Vampire OD
|
Removal to shore of topsides and jackets for
recycling/disposal
|
November 2017
|
|
Pipelines
|
All pipelines and associated mattresses to remain
in situ
|
November 2017
|
|
Leman BH
Decommissioning Programme (PDF, 4.66MB, 46
pages)
Leman BH
Close Out Report (PDF, 1.71MB, 25
pages)
|
Shell U.K. Limited
|
-
|
1 x platform
|
Removal to shore for either re-use or recycling
|
April 2017 Close Out Report Approved March 2019
|
|
Ettrick
and Blackbird (PDF, 2.1MB, 62
pages)
|
Nexen Petroleum UK Limited
|
-
|
FPSO
|
Removal for re-use at different location
|
March 2017
|
|
Subsea Equipment
|
Removal to shore for either re-use or recycling
|
March 2017
|
|
Pipelines
|
Removal to shore for either re-use or recycling;
buried pipelines to be left in-situ
|
March 2017
|
|
Ann A4
Decommissioning Programme (PDF, 1.37MB, 29
pages)
|
Centrica North Sea Limited
|
-
|
A4 Wellhead Protection Structure
|
Removal to shore for either re-use or recycling
|
February 2017
|
|
Janice
James & Affleck (PDF, 3.8MB, 115
pages)
|
Maersk Oil UK Limited
|
-
|
FPSO
|
Removal for recycling
|
September 2016
|
|
Subsea Equipment
|
Removal to shore for either re-use or recycling
|
September 2016
|
|
Pipelines
|
Removal to shore for either re-use or recycling;
buried pipelines to be left in-situ
|
September 2016
|
|
Athena
Decommissioning Programmes (PDF, 3.88MB, 70
pages)
|
Ithaca Energy (UK) Limited
|
-
|
FPSO
|
Removal for re-use at different location
|
September 2016
|
|
Subsea Equipment
|
Removal to shore for either re-use or recycling
|
September 2016
|
|
Pipelines
|
All 32 pipeline to be removed and returned to
shore for re-use or recycling
|
September 2016
|
|
Viking
Platforms (PDF, 3.53MB, 40
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
5 x fixed platforms Viking CD, DD, ED, GD, HD
|
Removal to shore of topsides and jackets for
recycling/disposal
|
September 2016
|
|
Leadon (PDF, 1.71MB, 53
pages)
|
Maersk Oil North Sea UK Limited
|
-
|
FPSO
|
Removal for re-use at different location
|
March 2016
|
|
Subsea
|
Removal of 2 x bundle towheads and mid-line
structure to shore for disposal; removal of 2 x
drill centres to shore for disposal
|
March 2016
|
|
Pipelines
|
2 x Pipeline bundles to be left in-situ, partial
removal of gas import pipeline
|
March 2016
|
|
Harding
STL (PDF, 2.61MB, 73
pages)
Harding
STL Close-Out Report (PDF, 1.62MB, 26
pages)
|
TAQA Bratani Limited
|
-
|
Harding Submerged Turret Loading (STL) System
|
Harding Submerged Turret Loading (STL) System to
be replaced by new Offshore Loading System. STL
to be removed to shore for recycling/disposal and
shuttle tanker mooring and loading buoy
interfaces returned to owner
|
2015
|
|
Thames
Area – Horne & Wren (PDF, 1.57MB, 48
pages)
|
Tullow Oil SK Limited
|
-
|
1x fixed platform
|
Removal of topsides and jackets to shore for
recycling/disposal
|
November 2015
|
|
Pipelines
|
To remain buried in situ
|
November 2015
|
|
Thames
Area – Orwell (PDF, 828KB, 42
pages)
|
Tullow Oil SK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
November 2015
|
|
Pipelines
|
To remain buried in situ
|
November 2015
|
|
Thames
Area – Wissey (PDF, 1.26MB, 43
pages)
|
Tullow Oil SK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
November 2015
|
|
Pipelines
|
To remain buried in situ
|
November 2015
|
|
Thames
Area – Thames Complex (PDF, 15.9MB, 76
pages)
|
Perenco UK Limited
|
-
|
3x fixed platforms
|
Removal of topsides and jackets to shore for
recycling/disposal
|
October 2015
|
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
October 2015
|
|
Pipelines
|
To remain buried in situ
|
October 2015
|
|
Thames
Area – Gawain (PDF, 3.8MB, 47
pages)
|
Perenco UK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
October 2015
|
|
Pipelines
|
To remain buried in situ
|
October 2015
|
|
Thames
Area – Arthur (PDF, 4.41MB, 46
pages)
|
Perenco UK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
October 2015
|
|
Pipelines
|
To remain buried in situ
|
October 2015
|
|
Brent -
Brent Delta Topside (PDF, 3.55MB, 72
pages)
Brent
Delta Topside Close Out
Report (PDF, 4.42MB, 53
pages)
|
Shell U.K. Limited
|
-
|
Brent Delta Topside
|
Removal of topside to shore for recycling and
disposal
|
July 2015, Close Out Report approved February
2020
|
|
Rose
Decommissioning Programmes (PDF, 2.87MB, 42
pages)
Rose
Close Out Report (PDF, 3.31MB, 36
pages)
|
Centrica Resources Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
May 2015 Close Out Report Approved October 2018
|
|
Pipelines
|
Removal of sections of un-trenched pipelines;
trenched pipelines decommissioned in situ
|
May 2015 Close Out Report Approved October 2018
|
|
Stamford (PDF, 2.71MB, 39
pages)
Stamford
Close Out Report (PDF, 2.66MB, 36
pages)
|
Centrica North Sea Gas Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
April 2015 Close Out Report approved February
2019
|
|
Pipelines
|
Removal of sections of un-trenched pipelines;
trenched pipelines decommissioned in situ
|
April 2015 Close Out Report approved February
2019
|
|
Murchison (PDF, 2.37MB, 70
pages)
|
CNR
|
-
|
Large Steel Platform
|
Topsides and jacket to top of footings to be
removed to shore for recycling/disposal. Footings
to remain in situ
|
August 2014
|
|
Pipelines
|
Export pipeline decommissioned in situ with
remedial rock placement.
Infield Flowlines to be removed for
recycling/disposal.
|
August 2014
|
|
Rubie
& Renee (PDF, 2.47MB, 50
pages)
|
Endeavour Energy UK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
April 2014
|
|
Pipelines
|
Selective Recovery
|
April 2014
|
|
Miller (PDF, 6.57MB, 198
pages)
|
BP Exploration (Alpha) Limited
|
|
Large Steel Platform
|
Footings to remain in place, steel topsides and
jacket to top of footings to be removed to shore
|
December 2013
|
|
Schiehallion
& Loyal Phase One (PDF, 1.84MB, 60
pages)
Schiehallion
& Loyal Phase One Close Out
Report (PDF, 1010KB, 22
pages)
|
Britoil Limited
|
-
|
Schiehallion FPSO
|
Removal for potential re-use
|
2013, Close Out Report Approved May 2019
|
|
Pipelines
|
Recovery where possible. Production flowlines to
be left in situ
|
2013, Close Out Report Approved May 2019
|
|
IVRR -
decommissoning programme (PDF, 1.57MB, 102
pages)
IVRR
Close Out Report (PDF, 4.74MB, 35
pages)
|
Hess limited
|
-
|
FPSO
|
Removal for re-use at different location
|
2013
|
|
Subsea installations
|
Removal to shore for recycling/disposal
|
2013
|
|
Pipelines
|
Selective recovery
|
2013
|
|
Camelot (PDF, 488KB, 39
pages)
Camelot
Close out report (PDF, 2.27MB, 41
pages)
|
Energy Resource Technology (UK) Limited
|
-
|
Small Steel Platform
|
Removal to shore for recycling / disposal
|
2012
|
|
Pipelines
|
Pipelines decommissioned in situ
|
2012
|
|
Fife,
Flora, Fergus, Angus: decommissioning
programme (PDF, 8.36MB, 135
pages)
FFFA
Close Out Report (PDF, 1.49MB, 33
pages)
|
Hess Limited
|
-
|
FPSO
|
Removed for re-use at different location
|
2012
|
|
Subsea installations
|
Removal to shore for recycling / disposal
|
2012
|
|
Pipelines
|
Full removal of un-trenched pipelines; trenched
pipelines decommissioned in situ
|
2012
|
|
Don
|
Britoil Public Limited Company
|
-
|
Subsea installation
|
Removal to shore for recycling / disposal
|
2011
|
|
Pipelines
|
Decommissioned in situ with selective recovery
|
2011
|
|
Welland
|
Perenco UK Limited
|
Perenco UK Limited
|
Small Steel Platform
|
Removal for re-use outside of UK waters
|
2010
|
|
Pipelines
|
Decommissioned in situ with selective recovery
|
2010
|
|
Tristan
NW
Close
out report
|
Silverstone Energy Limited
|
Bridge Energy UK Limited
|
Subsea installation
|
Removal to shore for recycling
|
2010; close-out report received January 2011
|
|
Pipelines
|
Production pipeline with piggy-backed umbilical -
leave in situ; jumpers, spool pieces and
associated pipeline equipment - remove to shore
for re-use or recycling
|
2010; close-out report received January 2011
|
|
Shelley
Close
out report
|
Premier Oil
|
-
|
Sevan Voyageur FPSO
|
Tow away for future use at another location
|
2010; close-out report received February 2012
|
|
Manifold and Wellhead
|
Remove to shore for re-use, recycling or disposal
|
2010; close-out report received February 2012
|
|
Pipelines
|
Production pipeline - leave in situ; umbilical -
remove in sections
|
2010; close-out report received February 2012
|
|
Kittiwake
SAL Export System
Close
out report
|
Venture North Sea Oil Limited
|
-
|
Kittiwake SAL Assembly
|
SAL Assembly - removal to shore for re-use.
Revision to approved decommissioning programme:
Completion of the removal of the SAL Assembly
extended to 31 July 2012
|
2009; close-out report received July 2012
|
|
Pipelines
|
Pipeline - flexible flowline removed to shore for
re-use
|
2009; close-out report received July 2012
|
|
MCP-01
Close
out report
|
Total E& P UK Limited
|
-
|
Manifold & Compression Platform
|
Permit granted for the disposal in-situ of the
concrete substructure; topsides to be removed to
shore for re-use, recycling or disposal
|
2008; close-out report received March 2013
|
|
Kittiwake
Loading Buoy
|
Venture North Sea Oil Limited
|
-
|
Exposed Location Single Buoy Mooring System
(ELSBM)
|
Removals to shore for recycling or disposal
|
2008
|
|
Linnhe (PDF, 2.25MB, 66
pages)</p>Linnhe
Close Out Report (PDF, 1000KB, 22
pages)
|
Mobil North Sea LLC
|
-
|
Wellhead Protection Structure
|
Removal to shore. Revision to approved
decommissioning programme: completion of the
removal of the Wellhead Protection Structure
extended to 30 June 2010
|
2008; year of revised approval: 2010
|
|
Pipelines
|
Decommissioned in situ; pipeline sections outside
trenches removed to shore. Revision to approved
decommissioning programme: completion of the
abandonment of the pipelines extended to 30 June
2010
|
2008; year of revised approval: 2010
|
|
Indefatigable
(Shell) (PDF, 11.6MB, 224
pages)</p>Close Out
Report (PDF, 2.47MB, 64
pages)
|
Shell U.K. Limited
|
-
|
6 x fixed steel platforms
|
Removal to shore
|
2007
|
|
Pipelines
|
2 x hose bundles removal to shore; 5 x infield +
export decommissioned in situ
|
2007
|
NW Hutton:
decommissioning programme (PDF, 14.9MB, 320
pages)
Close Out
Report (PDF, 2.52MB, 32
pages)
|
Amoco (U.K.) Exploration Company - now a
subsidiary of BP plc
|
-
|
Large Steel Platform
|
Footings to remain in place, steel topsides and
jacket to top of footings to be removed to shore
|
2006
|
|
Pipelines
|
Decommissioned in situ
|
2006
|
|
Ardmore
|
British American Offshore Limited
|
-
|
Mobile Jack-Up Rig
|
Re-use
|
2005
|
|
Ardmore
|
Ugland Nordic Shipping AS
|
-
|
Single Anchor Loading Systems
|
Re-use/removal to shore
|
2005
|
|
Pipelines
|
Re-use
|
2005
|
|
Ardmore
|
Acorn Oil & Gas Limited
|
-
|
Subsea equipment including guide frame
|
Removal to shore
|
2005
|
|
Brent
|
Shell
|
-
|
Brent Flare
|
Removals to shore for recycling and disposal
|
2004
|
|
Beatrice
|
Talisman Energy (UK) Limited
|
-
|
Fixed Steel Platforms
|
Re-use
|
2004
|
|
Forbes and Gordon Infield Pipelines
|
BHP Billiton
|
-
|
Infield Pipelines
|
Decommission in situ - retrench any area of
pipeline with less than 0.4m depth of cover
|
2003; close-out report received May 2005
|
|
Frigg TP1,
QP & CDP1
Close
out report
|
Total E&P Norge AS
|
-
|
Treatment Platform 1 (TP1), Quarters Platform
(QP) and Concrete Drilling Platform 1 (CDP1)
|
Concrete substructures to remain in place;
concrete topsides to be removed to shore; steel
installations to be removed to shore; infield
pipelines to be removed to shore
|
2003
|
|
Durward and Dauntless
|
Amerada Hess
|
-
|
Pipelines
|
Decommissioned in situ
|
2002
|
|
Hutton
|
Kerr-McGee
|
-
|
Tension Leg Platform
|
Re-use
|
2002; close-out report received July 2004
|
|
Pipelines
|
1 x removal to shore; 1 x decommissioned in situ
(with future monitoring programme)
|
2002; close-out report received July 2004
|
|
Camelot CB
|
ExxonMobil
|
-
|
Fixed Steel Platform
|
Re-use or removal to shore for recycling.
Revision to approved decommissioning option:
removal to shore for dismantling and recycling
|
2001. Year of revised approval: 2002
|
|
Blenheim and Bladon
|
Talisman
|
-
|
FPSO
|
Re-use
|
2000
|
|
Pipelines
|
Removal to shore
|
2000
|
|
Durward and Dauntless
|
Amerada Hess
|
-
|
FPSO
|
Re-use
|
2000
|
|
Subsea Facilities
|
Removal to shore
|
2000
|
|
Maureen
and Moira
|
Phillips
|
-
|
Large Steel Gravity Platform
|
Removal to shore for re-use or recycling
|
2000
|
|
Concrete Loading Column
|
Removal to shore for re-use or recycling
|
2000
|
|
Pipelines
|
2 x removal to shore;1 x decommissioned in situ
|
2000
|
|
Brent Spar
|
Shell
|
-
|
Oil Storage and Loading Facility
|
Re-use as part of quay extension. Revision to
approved decommissioning option: Brent Spar
Anchor Blocks - removal to shore for reuse,
recycling or disposal 1998
|
Year of revised approval: 2004
|
|
Donan
|
BP
|
-
|
FPSO
|
Re-use
|
1998
|
|
Fulmar SALM
|
Shell
|
-
|
Single Anchor Leg Mooring Buoy
|
Removal to shore
|
1998
|
|
16” Pipeline
|
Decommissioned in situ
|
1998
|
|
Emerald
|
MSR
|
-
|
FPSO
|
Re-use
|
1996
|
|
Pipeline
|
Decommissioned in situ
|
1996
|
|
Frigg FP
|
Elf Norge
|
TotalFinaElf Norge
|
Flare Column
|
Removal to shore
|
1996
|
|
Leman BK
|
Shell
|
-
|
Fixed Steel Platform
|
Removal to shore
|
1996
|
|
Staffa
|
Lasmo
|
-
|
Pipelines
|
Removal to shore
|
1996
|
|
Viking AC, AD, AP & FD
|
Conoco
|
-
|
4 x Fixed Steel Platform
|
Removal to shore
|
1996
|
|
Esmond CP & CW
|
BHP
|
-
|
2 x Fixed Steel Platform
|
Removal to shore
|
1995
|
|
Gordon BW
|
BHP
|
-
|
Fixed Steel Platform
|
Removal to shore
|
1995
|
|
Angus
|
Amerada Hess
|
-
|
Floating Production, Storage and Offloading
(FPSO) Vessel
|
Re-use
|
1993
|
|
Forbes AW
|
Hamilton
|
BHP
|
Fixed Steel Platform
|
Removal to shore
|
1993
|
|
Argyll, Duncan and Innes
|
Hamilton
|
BHP
|
Floating Production, Facility (FPF)
|
Removal to shore
|
1992
|
|
Catenary Anchor Leg Mooring (CALM) Buoy
|
Removal to shore
|
1992
|
|
Pipelines
|
Removal to shore
|
1992
|
|
Blair
|
Sun Oil
|
AGIP
|
Pipelines
|
1 x Re-use; 1 x Decommissioned in situ
|
1992
|
|
Crawford
|
Hamilton Oil
|
BHP
|
Floating Production, Facility (FPF)
|
Removal to shore
|
1991
|
|
Catenary Anchor Leg Mooring (CALM) Buoy
|
Removal to shore
|
1991
|
|
Subsea Facilities
|
Removal to shore
|
1991
|
|
Piper Alpha
|
Occidental
|
Talisman
|
Fixed Steel Platform
|
Toppling
|
1988
|