Field Name
|
Operator at approval
|
Operator following licence / company change
|
Main installations decommissioned
|
Approved option
|
Year of approval
|
Pickerill
A & B(PDF, 1.26MB, 21
pages)
|
Perenco Gas (UK) Limited
|
-
|
Telecommunication towers, sub-cellar deck
equipment, appurtenances, caissons, associated
tanks and lift pumps, supply hoses, a pipeline
riser emergency shutdown valve and tertiary
steelwork
|
Removal to shore for reuse, recycling or disposal
|
March 2019
|
Curlew B,
C and D (PDF, 2.4MB, 61
pages)
|
Shell U.K. Limited
|
-
|
FPSO
|
Removal to shore for recycling/disposal
|
March 2019
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
March 2019
|
Pipelines
|
Removal to shore for either re-use or recycling;
buried pipelines to be left in-situ
|
March 2019
|
Viking
Platforms, Vixen and associated Pipelines
(VDP2)(PDF, 33.3MB, 84
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
Viking Satellites KD, LD, AR, Viking Bravo Hub
BA, BC, BP, BD and Vixen sub-sea tieback
|
Removal to shore for re-use, recycling or
disposal
|
January 2019
|
Pipelines
|
Decommissioned in situ
|
January 2019
|
Victor
(VDP3)(PDF, 21.1MB, 55
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
Victor Platform and subsea installation
|
Removal to shore for re-use, recycling or
disposal
|
January 2019
|
Pipelines
|
Decommissioned in situ
|
January 2019
|
Tyne South
Installations(PDF, 1.83MB, 42
pages)
|
Perenco UK Limited
|
-
|
Topsides, jacket and subsea installation
|
Removal to shore for reuse, recycling or disposal
|
January 2019
|
Guinevere
Installation (PDF, 2.05MB, 43
pages)
|
Perenco UK Limited
|
-
|
Topsides and jacket
|
Removal to shore for reuse, recycling or disposal
|
January 2019
|
Beatrice
Decommissioning Programmes(PDF, 4.45MB, 88
pages)
|
Repsol Sinopec Resources UK Limited
|
-
|
Beatrice AP Topsides; AD, Bravo and Charlie
Platforms and AD Drilling Template
|
Removal to shore for re-use/recycling
|
January 2019
|
Pipelines
|
Buried pipelines will be left in situ.
Remediation for any exposed sections.
|
January 2019
|
Bains
Decommissioning Programmes(PDF, 2.57MB, 36
pages)
|
Spirit Energy Production UK Limited
|
-
|
Subsea Installation
|
Removal to shore for re-use/recycling
|
January 2019
|
Pipelines
|
Decommissioned in situ
|
January 2019
|
Jacky (PDF, 2.34MB, 52
pages)
|
Ithaca Energy (UK) Limited
|
-
|
Wellhead Platform and Midline Tee Structure
|
Removal to shore for either re-use or recycling
|
October 2018
|
Pipelines
|
Pipelines are trenched and buried and will be
left in situ
|
October 2018
|
Brae Bravo
Topsides, Flare Bridge, Flare Tower and Flare
Jacket and Substructure(PDF, 4.9MB, 52
pages)
|
Marathon Oil UK LLC
|
-
|
Brae Bravo Topsides, Flare Bridge, Flare Tower
and Flare Jacket/Substructure
|
Removal to shore for either re-use or recycling
|
August 2018
|
Brent
Alpha, Bravo and Charlie
Topsides (PDF, 3.34MB, 81
pages)
|
Shell U.K. Limited
|
-
|
Brent Alpha, Brent Bravo and Brent Charlie
Topsides
|
Removal to shore for recycling/disposal
|
August 2018
|
Stirling
A33 WHPS Decommissioning
Programme(PDF, 1.13MB, 27
pages)
Stirling
WHPS Close Out Report(PDF, 2.57MB, 15
pages)
|
Premier Oil E&P UK Limited
|
-
|
Subsea installation
|
Removal to shore for recycling
|
May 2018
|
Ann and
Alison(PDF, 2.98MB, 60
pages)
|
Spirit Energy North Sea Limited
|
-
|
Subsea installations
|
Removal to shore for either re-use or recycling
|
April 2018
|
Pipelines
|
Buried and stable pipelines left in situ. Surface
laid pipelines removed to shore for re-use or
recycling
|
April 2018
|
Saturn
(Annabel)(PDF, 2.49MB, 47
pages)
|
Spirit Energy North Sea Limited
|
-
|
Subsea installations
|
Removal to shore for either re-use or recycling
|
April 2018
|
Pipelines
|
Buried and stable pipelines left in situ. Surface
laid pipelines removed to shore for re-use or
recycling
|
April 2018
|
Audrey (PDF, 2.87MB, 58
pages)
|
Spirit Energy North Sea Limited
|
-
|
2 fixed platforms
|
Removal of topsides and jackets to shore for
recycling or disposal
|
April 2018
|
Pipelines
|
Buried and stable pipelines decommissioned in
situ. Surface laid pipelines removed to shore for
re-use or recycling
|
April 2018
|
Rev
Decommissioning Programme(PDF, 12MB, 42
pages)
|
Repsol Norge AS
|
-
|
Pipelines
|
Fully buried and stable pipeline to be left in
situ. All other pipelines to be removed. All
mattresses on pipelines to be removed
|
April 2018
|
Markham
ST-1(PDF, 2.39MB, 49
pages)
|
Centrica Production Nederland B.V.
|
-
|
Fixed Platform
|
Removal to shore for either re-use or recycling
|
February 2018
|
Pipelines
|
Two pipelines to be decommissioned in situ
|
February 2018
|
Osprey (PDF, 3.92MB, 68
pages)
|
Fairfield Fagus Limited
|
-
|
Subsea Installation
|
Removed and recovered to shore for
recycling/disposal
|
December 2017
|
Pipelines
|
Full removal with the exception of the Bundles,
Umbilical Risers within the Dunlin Alpha Concrete
Gravity Based Structure or those trenched and
rock dumped
|
December 2017
|
Merlin (PDF, 2.97MB, 56
pages)
|
Fairfield Fagus Limited
|
-
|
Subsea Installation
|
Removed and recovered to shore for
recycling/disposal
|
December 2017
|
Pipelines
|
Full removal with the exception of trenched and
rock dumped Pipelines and Umbilicals and
Umbilical Riser within the Dunlin Alpha Concrete
Gravity Based Structure
|
December 2017
|
Dunlin
Fuel Gas Import (DFGI) and Dunlin Power Import
(DPI)(PDF, 3.48MB, 54
pages)
|
Fairfield Fagus Limited
|
-
|
Subsea Installation
|
Removed and recovered to shore for
recycling/disposal
|
December 2017
|
Pipelines
|
Full removal with the exception of trenched and
buried Pipelines and Rigid Riser and Riser Cable
within the Dunlin Alpha Concrete Gravity Based
Structure
|
December 2017
|
Viking
Satellites CD, DD, ED, GD, HD
Pipelines(PDF, 6.77MB, 32
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
Pipelines
|
All pipelines and associated mattresses to remain
in situ
|
November 2017
|
LOGGS
Satellites Vulcan UR, Viscount VO, Vampire OD -
LDP1 (PDF, 17.5MB, 61
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
3 x fixed platforms - Vulcan UR, Viscount VO and
Vampire OD
|
Removal to shore of topsides and jackets for
recycling/disposal
|
November 2017
|
Pipelines
|
All pipelines and associated mattresses to remain
in situ
|
November 2017
|
Leman BH
Decommissioning Programme(PDF, 4.66MB, 46
pages)
Leman BH
Close Out Report (PDF, 1.71MB, 25
pages)
|
Shell U.K. Limited
|
-
|
1 x platform
|
Removal to shore for either re-use or recycling
|
April 2017 Close Out Report Approved March 2019
|
Ettrick
and Blackbird (PDF, 2.1MB, 62
pages)
|
Nexen Petroleum UK Limited
|
-
|
FPSO
|
Removal for re-use at different location
|
March 2017
|
Subsea Equipment
|
Removal to shore for either re-use or recycling
|
March 2017
|
Pipelines
|
Removal to shore for either re-use or recycling;
buried pipelines to be left in-situ
|
March 2017
|
Ann A4
Decommissioning Programme(PDF, 1.37MB, 29
pages)
|
Centrica North Sea Limited
|
-
|
A4 Wellhead Protection Structure
|
Removal to shore for either re-use or recycling
|
February 2017
|
Janice
James & Affleck (PDF, 3.8MB, 115
pages)
|
Maersk Oil UK Limited
|
-
|
FPSO
|
Removal for recycling
|
September 2016
|
Subsea Equipment
|
Removal to shore for either re-use or recycling
|
September 2016
|
Pipelines
|
Removal to shore for either re-use or recycling;
buried pipelines to be left in-situ
|
September 2016
|
Athena
Decommissioning Programmes(PDF, 3.88MB, 70
pages)
|
Ithaca Energy (UK) Limited
|
-
|
FPSO
|
Removal for re-use at different location
|
September 2016
|
Subsea Equipment
|
Removal to shore for either re-use or recycling
|
September 2016
|
Pipelines
|
All 32 pipeline to be removed and returned to
shore for re-use or recycling
|
September 2016
|
Viking
Platforms(PDF, 3.53MB, 40
pages)
|
ConocoPhillips (U.K.) Limited
|
-
|
5 x fixed platforms Viking CD, DD, ED, GD, HD
|
Removal to shore of topsides and jackets for
recycling/disposal
|
September 2016
|
Leadon (PDF, 1.71MB, 53
pages)
|
Maersk Oil North Sea UK Limited
|
-
|
FPSO
|
Removal for re-use at different location
|
March 2016
|
Subsea
|
Removal of 2 x bundle towheads and mid-line
structure to shore for disposal; removal of 2 x
drill centres to shore for disposal
|
March 2016
|
Pipelines
|
2 x Pipeline bundles to be left in-situ, partial
removal of gas import pipeline
|
March 2016
|
Harding
STL(PDF, 2.61MB, 73
pages)
Harding
STL Close-Out Report(PDF, 1.62MB, 26
pages)
|
TAQA Bratani Limited
|
-
|
Harding Submerged Turret Loading (STL) System
|
Harding Submerged Turret Loading (STL) System to
be replaced by new Offshore Loading System. STL
to be removed to shore for recycling/disposal and
shuttle tanker mooring and loading buoy
interfaces returned to owner
|
2015
|
Thames
Area – Horne & Wren (PDF, 1.57MB, 48
pages)
|
Tullow Oil SK Limited
|
-
|
1x fixed platform
|
Removal of topsides and jackets to shore for
recycling/disposal
|
November 2015
|
Pipelines
|
To remain buried in situ
|
November 2015
|
Thames
Area – Orwell (PDF, 828KB, 42
pages)
|
Tullow Oil SK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
November 2015
|
Pipelines
|
To remain buried in situ
|
November 2015
|
Thames
Area – Wissey (PDF, 1.26MB, 43
pages)
|
Tullow Oil SK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
November 2015
|
Pipelines
|
To remain buried in situ
|
November 2015
|
Thames
Area – Thames Complex (PDF, 15.9MB, 76
pages)
|
Perenco UK Limited
|
-
|
3x fixed platforms
|
Removal of topsides and jackets to shore for
recycling/disposal
|
October 2015
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
October 2015
|
Pipelines
|
To remain buried in situ
|
October 2015
|
Thames
Area – Gawain (PDF, 3.8MB, 47
pages)
|
Perenco UK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
October 2015
|
Pipelines
|
To remain buried in situ
|
October 2015
|
Thames
Area – Arthur (PDF, 4.41MB, 46
pages)
|
Perenco UK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
October 2015
|
Pipelines
|
To remain buried in situ
|
October 2015
|
Brent -
Brent Delta Topside(PDF, 3.55MB, 72
pages)
Brent
Delta Topside Interim Close Out
Report(PDF, 3.39MB, 49
pages)
|
Shell U.K. Limited
|
-
|
Brent Delta Topside
|
Removal of topside to shore for recycling and
disposal
|
July 2015
|
Rose
Decommissioning Programmes(PDF, 2.87MB, 42
pages)
Rose Close
Out Report (PDF, 3.31MB, 36
pages)
|
Centrica Resources Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
May 2015 Close Out Report Approved October 2018
|
Pipelines
|
Removal of sections of un-trenched pipelines;
trenched pipelines decommissioned in situ
|
May 2015 Close Out Report Approved October 2018
|
Stamford (PDF, 2.71MB, 39
pages)
Stamford
Close Out Report (PDF, 2.66MB, 36
pages)
|
Centrica North Sea Gas Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
April 2015 Close Out Report approved February
2019
|
Pipelines
|
Removal of sections of un-trenched pipelines;
trenched pipelines decommissioned in situ
|
April 2015 Close Out Report approved February
2019
|
Murchison (PDF, 2.37MB, 70
pages)
|
CNR
|
-
|
Large Steel Platform
|
Topsides and jacket to top of footings to be
removed to shore for recycling/disposal. Footings
to remain in situ
|
August 2014
|
Pipelines
|
Export pipeline decommissioned in situ with
remedial rock placement.
Infield Flowlines to be removed for
recycling/disposal.
|
August 2014
|
Rubie
& Renee(PDF, 2.47MB, 50
pages)
|
Endeavour Energy UK Limited
|
-
|
Subsea Installations
|
Removal to shore for recycling/disposal
|
April 2014
|
Pipelines
|
Selective Recovery
|
April 2014
|
Miller (PDF, 6.57MB, 198
pages)
|
BP Exploration (Alpha) Limited
|
|
Large Steel Platform
|
Footings to remain in place, steel topsides and
jacket to top of footings to be removed to shore
|
December 2013
|
Schiehallion
& Loyal Phase One(PDF, 1.84MB, 60
pages)
|
Britoil Limited
|
-
|
Schiehallion FPSO
|
Removal for potential re-use
|
2013
|
Pipelines
|
Recovery where possible. Production flowlines to
be left in situ.
|
2013
|
IVRR -
decommissoning programme (PDF, 1.57MB, 102
pages)
IVRR Close
Out Report (PDF, 4.74MB, 35
pages)
|
Hess limited
|
-
|
FPSO
|
Removal for re-use at different location
|
2013
|
Subsea installations
|
Removal to shore for recycling/disposal
|
2013
|
Pipelines
|
Selective recovery
|
2013
|
Camelot (PDF, 488KB, 39
pages)
Camelot
Close out report (PDF, 2.27MB, 41
pages)
|
Energy Resource Technology (UK) Limited
|
-
|
Small Steel Platform
|
Removal to shore for recycling / disposal
|
2012
|
Pipelines
|
Pipelines decommissioned in situ
|
2012
|
Fife,
Flora, Fergus, Angus: decommissioning
programme (PDF, 8.36MB, 135
pages)
FFFA Close
Out Report (PDF, 1.49MB, 33
pages)
|
Hess Limited
|
-
|
FPSO
|
Removed for re-use at different location
|
2012
|
Subsea installations
|
Removal to shore for recycling / disposal
|
2012
|
Pipelines
|
Full removal of un-trenched pipelines; trenched
pipelines decommissioned in situ
|
2012
|
Don
|
Britoil Public Limited Company
|
-
|
Subsea installation
|
Removal to shore for recycling / disposal
|
2011
|
Pipelines
|
Decommissioned in situ with selective recovery
|
2011
|
Welland
|
Perenco UK Limited
|
Perenco UK Limited
|
Small Steel Platform
|
Removal for re-use outside of UK waters
|
2010
|
Pipelines
|
Decommissioned in situ with selective recovery
|
2010
|
Tristan
NW
Close out
report
|
Silverstone Energy Limited
|
Bridge Energy UK Limited
|
Subsea installation
|
Removal to shore for recycling
|
2010; close-out report received January 2011
|
Pipelines
|
Production pipeline with piggy-backed umbilical -
leave in situ; jumpers, spool pieces and
associated pipeline equipment - remove to shore
for re-use or recycling
|
2010; close-out report received January 2011
|
Shelley
Close out
report
|
Premier Oil
|
-
|
Sevan Voyageur FPSO
|
Tow away for future use at another location
|
2010; close-out report received February 2012
|
Manifold and Wellhead
|
Remove to shore for re-use, recycling or disposal
|
2010; close-out report received February 2012
|
Pipelines
|
Production pipeline - leave in situ; umbilical -
remove in sections
|
2010; close-out report received February 2012
|
Kittiwake
SAL Export System
Close out
report
|
Venture North Sea Oil Limited
|
-
|
Kittiwake SAL Assembly
|
SAL Assembly - removal to shore for re-use.
Revision to approved decommissioning programme:
Completion of the removal of the SAL Assembly
extended to 31 July 2012
|
2009; close-out report received July 2012
|
Pipelines
|
Pipeline - flexible flowline removed to shore for
re-use
|
2009; close-out report received July 2012
|
MCP-01
Close out
report
|
Total E& P UK Limited
|
-
|
Manifold & Compression Platform
|
Permit granted for the disposal in-situ of the
concrete substructure; topsides to be removed to
shore for re-use, recycling or disposal
|
2008; close-out report received March 2013
|
Kittiwake
Loading Buoy
|
Venture North Sea Oil Limited
|
-
|
Exposed Location Single Buoy Mooring System
(ELSBM)
|
Removals to shore for recycling or disposal
|
2008
|
Linnhe (PDF, 2.25MB, 66
pages) </p>Linnhe
Close Out Report (PDF, 1000KB, 22
pages)
|
Mobil North Sea LLC
|
-
|
Wellhead Protection Structure
|
Removal to shore. Revision to approved
decommissioning programme: completion of the
removal of the Wellhead Protection Structure
extended to 30 June 2010
|
2008; year of revised approval: 2010
|
Pipelines
|
Decommissioned in situ; pipeline sections outside
trenches removed to shore. Revision to approved
decommissioning programme: completion of the
abandonment of the pipelines extended to 30 June
2010
|
2008; year of revised approval: 2010
|
Indefatigable
(Shell) (PDF, 11.6MB, 224
pages) </p>Close Out
Report(PDF, 2.47MB, 64
pages)
|
Shell U.K. Limited
|
-
|
6 x fixed steel platforms
|
Removal to shore
|
2007
|
Pipelines
|
2 x hose bundles removal to shore; 5 x infield +
export decommissioned in situ
|
2007
|
NW Hutton:
decommissioning programme (PDF, 14.9MB, 320
pages)
Close Out
Report(PDF, 2.52MB, 32
pages)
|
Amoco (U.K.) Exploration Company - now a
subsidiary of BP plc
|
-
|
Large Steel Platform
|
Footings to remain in place, steel topsides and
jacket to top of footings to be removed to shore
|
2006
|
Pipelines
|
Decommissioned in situ
|
2006
|
Ardmore
|
British American Offshore Limited
|
-
|
Mobile Jack-Up Rig
|
Re-use
|
2005
|
Ardmore
|
Ugland Nordic Shipping AS
|
-
|
Single Anchor Loading Systems
|
Re-use/removal to shore
|
2005
|
Pipelines
|
Re-use
|
2005
|
Ardmore
|
Acorn Oil & Gas Limited
|
-
|
Subsea equipment including guide frame
|
Removal to shore
|
2005
|
Brent
|
Shell
|
-
|
Brent Flare
|
Removals to shore for recycling and disposal
|
2004
|
Beatrice
|
Talisman Energy (UK) Limited
|
-
|
Fixed Steel Platforms
|
Re-use
|
2004
|
Forbes and Gordon Infield Pipelines
|
BHP Billiton
|
-
|
Infield Pipelines
|
Decommission in situ - retrench any area of
pipeline with less than 0.4m depth of cover
|
2003; close-out report received May 2005
|
Frigg TP1,
QP & CDP1
Close out
report
|
Total E&P Norge AS
|
-
|
Treatment Platform 1 (TP1), Quarters Platform
(QP) and Concrete Drilling Platform 1 (CDP1)
|
Concrete substructures to remain in place;
concrete topsides to be removed to shore; steel
installations to be removed to shore; infield
pipelines to be removed to shore
|
2003
|
Durward and Dauntless
|
Amerada Hess
|
-
|
Pipelines
|
Decommissioned in situ
|
2002
|
Hutton
|
Kerr-McGee
|
-
|
Tension Leg Platform
|
Re-use
|
2002; close-out report received July 2004
|
Pipelines
|
1 x removal to shore; 1 x decommissioned in situ
(with future monitoring programme)
|
2002; close-out report received July 2004
|
Camelot CB
|
ExxonMobil
|
-
|
Fixed Steel Platform
|
Re-use or removal to shore for recycling.
Revision to approved decommissioning option:
removal to shore for dismantling and recycling
|
2001. Year of revised approval: 2002
|
Blenheim and Bladon
|
Talisman
|
-
|
FPSO
|
Re-use
|
2000
|
Pipelines
|
Removal to shore
|
2000
|
Durward and Dauntless
|
Amerada Hess
|
-
|
FPSO
|
Re-use
|
2000
|
Subsea Facilities
|
Removal to shore
|
2000
|
Maureen
and Moira
|
Phillips
|
-
|
Large Steel Gravity Platform
|
Removal to shore for re-use or recycling
|
2000
|
Concrete Loading Column
|
Removal to shore for re-use or recycling
|
2000
|
Pipelines
|
2 x removal to shore;1 x decommissioned in situ
|
2000
|
Brent Spar
|
Shell
|
-
|
Oil Storage and Loading Facility
|
Re-use as part of quay extension. Revision to
approved decommissioning option: Brent Spar
Anchor Blocks - removal to shore for reuse,
recycling or disposal 1998
|
Year of revised approval: 2004
|
Donan
|
BP
|
-
|
FPSO
|
Re-use
|
1998
|
Fulmar SALM
|
Shell
|
-
|
Single Anchor Leg Mooring Buoy
|
Removal to shore
|
1998
|
16” Pipeline
|
Decommissioned in situ
|
1998
|
Emerald
|
MSR
|
-
|
FPSO
|
Re-use
|
1996
|
Pipeline
|
Decommissioned in situ
|
1996
|
Frigg FP
|
Elf Norge
|
TotalFinaElf Norge
|
Flare Column
|
Removal to shore
|
1996
|
Leman BK
|
Shell
|
-
|
Fixed Steel Platform
|
Removal to shore
|
1996
|
Staffa
|
Lasmo
|
-
|
Pipelines
|
Removal to shore
|
1996
|
Viking AC, AD, AP & FD
|
Conoco
|
-
|
4 x Fixed Steel Platform
|
Removal to shore
|
1996
|
Esmond CP & CW
|
BHP
|
-
|
2 x Fixed Steel Platform
|
Removal to shore
|
1995
|
Gordon BW
|
BHP
|
-
|
Fixed Steel Platform
|
Removal to shore
|
1995
|
Angus
|
Amerada Hess
|
-
|
Floating Production, Storage and Offloading
(FPSO) Vessel
|
Re-use
|
1993
|
Forbes AW
|
Hamilton
|
BHP
|
Fixed Steel Platform
|
Removal to shore
|
1993
|
Argyll, Duncan and Innes
|
Hamilton
|
BHP
|
Floating Production, Facility (FPF)
|
Removal to shore
|
1992
|
Catenary Anchor Leg Mooring (CALM) Buoy
|
Removal to shore
|
1992
|
Pipelines
|
Removal to shore
|
1992
|
Blair
|
Sun Oil
|
AGIP
|
Pipelines
|
1 x Re-use; 1 x Decommissioned in situ
|
1992
|
Crawford
|
Hamilton Oil
|
BHP
|
Floating Production, Facility (FPF)
|
Removal to shore
|
1991
|
Catenary Anchor Leg Mooring (CALM) Buoy
|
Removal to shore
|
1991
|
Subsea Facilities
|
Removal to shore
|
1991
|
Piper Alpha
|
Occidental
|
Talisman
|
Fixed Steel Platform
|
Toppling
|
1988
|