Monthly reports of construction noise and vibration monitoring
for HS2, taken within local authorities along the Phase One
(London to West Midlands) route.
Birmingham noise monitoring
report (September 2025)
Brent noise monitoring report
(September 2025)
Buckinghamshire noise monitoring
report (September 2025)
Camden noise monitoring report
(September 2025)
Cherwell noise monitoring report
(September 2025)
Ealing noise monitoring report
(September 2025)
Hillingdon noise monitoring
report (September 2025)
Lichfield noise monitoring
report (September 2025)
North Warwickshire noise
monitoring report (September 2025)
Solihull noise monitoring report
(September 2025)
Stratford-on-Avon noise
monitoring report (September 2025)
Three Rivers noise monitoring
report (September 2025)
Warwick District noise
monitoring report (September 2025)
West Northamptonshire noise
monitoring report (September 2025)
Details
The reports contain monitoring data and interpretative results,
including a summary of the construction activities occurring.
This covers any complaints received, data recorded over the
monitoring period, and periods which exceeded agreed trigger
levels and the results of any investigations. Where High Speed
Two (HS2) works have been identified as the source, the reports
include actions taken to resolve the issue and to prevent a
recurrence.
HS2 Ltd and its contractors are required to undertake
construction noise and vibration monitoring, and produce monthly
reports, to comply with the Code of Construction Practice (CoCP).
The reports are specific to each local authority area along the
Phase One route.
Monthly air quality monitoring reports for HS2, taken within
local authorities along the Phase One (London to West Midlands)
route.
Buckinghamshire Council air
quality monthly report (September 2025)
Birmingham City Council air
quality monthly report (September 2025)
Cherwell District Council air
quality monthly report (September 2025)
City of Westminster air quality
monthly report (September 2025)
London Borough of Brent air
quality monthly report (September 2025)
London Borough of Camden air
quality monthly report (September 2025)
London Borough of Ealing air
quality monthly report (September 2025)
London Borough of Hillingdon air
quality monthly report (September 2025)
London Borough of Hammersmith
and Fulham air quality monthly report (September
2025)
Lichfield District Council air
quality monthly report (September 2025)
North Warwickshire Borough
Council air quality monthly report (September 2025)
Royal Borough of Kensington and
Chelsea air quality monthly report (September 2025)
Solihull Metropolitan Borough
Council air quality monthly report (September 2025)
Stratford-on-Avon District
Council air quality monthly report (September 2025)
Three Rivers District Council
air quality monthly report (September 2025)
Warwick District Council air
quality monthly report (September 2025)
West Northamptonshire District
Council air quality monthly report (September 2025)
Details
The reports contain monitoring data and interpretative results,
including a summary of the construction activities occurring.
This covers any complaints received, data recorded over the
monitoring period, and periods which exceeded agreed trigger
levels and the results of any investigations. Where High Speed
Two (HS2) works have been identified as the source, the reports
include actions taken to resolve the issue and to prevent a
recurrence.
HS2 Ltd and its contractors are required to undertake air quality
and dust monitoring, and produce monthly reports, to comply with
the Code of Construction Practice (CoCP). The reports are
specific to each local authority area along the Phase One route.
The CoCP forms part of the Environmental Minimum Requirements
(EMRs). The EMRs set out high-level environmental and
sustainability commitments to be carried out during the planning
and implementation of works along the Phase One route.