Published 23 January 2013 Last updated 4 September 2025 — See all
updates Overview The decommissioning of offshore oil and gas
installations and pipelines on the United Kingdom Continental Shelf
(UKCS) is controlled through the Petroleum Act 1998. The
responsibility for ensuring that the requirements of the Petroleum
Act 1998 are complied with rests with the Offshore Petroleum
Regulator for Environment and Decommissioning (OPRED) which sits
within the...Request free trial
Published 23 January 2013
Last updated 4 September 2025 — See all updates
Overview
The decommissioning of offshore oil and gas installations and
pipelines on the United Kingdom Continental Shelf (UKCS) is controlled through the
Petroleum
Act 1998.
The responsibility for ensuring that the requirements of the
Petroleum Act 1998 are complied with rests with the Offshore
Petroleum Regulator for Environment and Decommissioning
(OPRED)
which sits within the Department for Business, Energy and
Industrial Strategy.
Owners of oil and gas installations and pipelines are required to
decommission their offshore infrastructure at the end of a
field's economic life and the 1998 Act requires owners to set out
the measures to decommission disused installations and/or
pipelines in a decommissioning programme.
A decommissioning programme must identify all the items of
equipment, infrastructure and materials that have been installed
or drilled and describe the decommissioning solution for each.
OPRED aims to be transparent in its consideration of
decommissioning programmes. As a result members of the public,
other organisations, non-governmental organisations and other
government departments or agencies are invited to comment on the
proposals set out in a programme.
Details of the current programmes under consideration are noted
in the table below.
OPRED provides guidance on the regulatory requirements for
decommissioning. Final guidance on the Environmental
Considerations for Decommissioning (Section 12) has now been
incorporated into the guidance notes Offshore Oil and Gas
Decommissioning Guidance Notes November 2018 (PDF, 1.27 MB, 138 pages).
Please see Updates to Offshore Oil
and Gas Decommissioning Guidance
Financial Assurance Guidance for the Decommissioning of Offshore
Oil and Gas Installations and Pipelines. Financial Assurance
Guidance (PDF,
278 KB, 17 pages)
The guidance outlines how the government assesses the financial
capability of persons with a relevant interest in or considering
taking an interest in an offshore oil or gas field. For the
purposes of satisfying the Secretary of State that that person
will be capable of carrying out a decommissioning programme in
relation to that interest.
It explains our financial assurance policy and existing processes
setting out the steps taken to assess the financial health of
offshore oil and gas companies with an interest or potential
interest in a field, outlining how and when we may use the
statutory powers set out in the Petroleum Act 1998.
If you have any comments or questions relevant to the guidance,
please email us at odu@energysecurity.gov.uk.
Proposed changes to charging a fee in respect of
decommissioning offshore (oil and gas) installations and
pipelines under the Petroleum Act 1998 as amended by the Energy
Act 2008
The aim of this consultation was to formally seek views from
stakeholders such as offshore oil and gas operators, companies
with an interest in decommissioning offshore oil and gas
installations and pipelines, and other interested parties, on the
proposal to update the charging regime for activity related to
the regulatory functions for the decommissioning of offshore oil
and gas installations. Fees consultation document
- May 2021 (PDF, 224 KB, 19 pages) Offshore oil and gas cost
recovery consultation impact assessment(PDF, 247 KB, 11 pages) Response to consultation
document - April 2022(PDF, 189 KB, 12 pages)
If you have any questions regarding the proposed changes please
direct these to odu@energysecurity.gov.uk.
Draft decommissioning programmes under
consideration
Decommissioning Programme
|
Operator
|
Main Points of DP
|
Documents
|
|
Ravenspurn North GCD Topside DP
|
Perenco UK Limited
|
Topside to be removed to shore for reuse, recycling or
disposal
|
Ravenspurn GCD
Topside DP (PDF, 2.48 MB, 58 pages)
|
|
Pickerill Alpha and Bravo Riser Sections
|
Perenco Gas (UK) Limited
|
Risers to be removed to shore for reuse, recycling or
disposal
|
Pickerill Alpha and
Bravo Risers(PDF, 1.78 MB, 32 pages)
|
|
GPIII FPSO Sailaway and Disconnection of Risers and
Pipelines
|
NEO Energy Production UK Limited
|
Full removal of the FPSO, flexible risers, dynamic
umbilical and the associated riser buoyancy modules.
Partial recovery of mooring chains.
|
GPIII FPSO Sailaway
& Disconnection of Risers and Pipelines
DP(PDF,
4.46 MB, 57 pages)
|
|
Trent Topsides and Risers
|
Perenco UK Limited
|
Topside and risers to be removed to shore for reuse,
recycling or disposal
|
Trent Topsides and
Risers DP(PDF, 1.4 MB, 42 pages)
|
|
Gannet A Mast DP
|
Shell U.K. Limited
|
Full removal of Gannet A Mast
|
Gannet A Mast DP
(PDF, 2.24
MB, 33 pages)
|
|
Tyne Field Pipelines
|
Perenco UK Limited
|
Trenched and buried pipelines and associated
protection/stabilisation features to be left in situ.
|
Tyne Pipelines
DP(PDF,
2.39 MB, 49 pages) Tyne Pipelines
EA(PDF,
7.01 MB, 142 pages) Tyne Pipelines
CA(PDF,
2.46 MB, 65 pages)
|
|
Stella FPF-1, Moorings and Riser Systems
|
Ithaca Energy (UK) Limited
|
Stella FPF-1 Floating Production Facility, mooring systems,
risers, and all pipeline structures within the FPF-1 500m
safety zone will be recovered to shore for re-use or
recycling. Mooring piles will be fully recovered to -3m
below seabed. Mooring lines will be cut -1m below the
seabed and recovered.
|
Stella FPF-1
DP(PDF,
6.77 MB, 67 pages) Stella FPF-1 Mooring
Lines CA (PDF, 1.7 MB, 26 pages)
|
|
Ninian Southern Topsides, Upper Jacket and Associated Riser
Sections
|
CNR International (U.K.) Limited
|
Full removal of Topsides. The Upper Jacket and Riser
Sections will be cut between 77m and 87m below LAT. The
Topsides, Upper Jacket and associated Risers will be
returned to shore for re-use or recycling.
|
Ninian Southern
Topsides, Upper Jacket and Associated
Risers(PDF, 6.78 MB, 67 pages)
|
|
Cladhan Subsea Facilities
|
Taqa Bratani Limited
|
Subsea installations, surface laid pipelines and umbilicals
to be recovered to shore for re-use or recycling. Buried
pipelines to be left in situ. Protection/stabilisation
features will be recovered to shore.
|
Cladhan
DP(PDF,
1.32 MB, 45 pages) Tern Subsea EA
(PDF, 6.79
MB, 196 pages) Tern Subsea CA
(PDF, 11.8
MB, 255 pages)
|
|
Hudson Subsea Facilities
|
Taqa Bratani Limited
|
Subsea installations, surface laid pipelines and umbilicals
to be recovered to shore for re-use or recycling. Buried
pipelines to be left in situ. Protection/stabilisation
features will be recovered to shore.
|
Hudson DP
(PDF, 1.81
MB, 60 pages) Tern Subsea EA
(PDF, 6.79
MB, 196 pages) Tern Subsea CA
(PDF, 11.8
MB, 255 pages)
|
|
Kestrel and Falcon Subsea Facilities
|
Taqa Bratani Limited
|
Subsea installations, surface laid pipelines and umbilicals
to be recovered to shore for re-use or recycling. Buried
pipelines to be left in situ. Protection/stabilisation
features will be recovered to shore.
|
Kestrel_Falcon
DP (PDF,
1.41 MB, 52 pages)Tern Subsea
EA(PDF,
6.79 MB, 196 pages) Tern Subsea CA
(PDF, 11.8
MB, 255 pages)
|
|
Nelson Derrick Decommissioning Programme
|
Enterprise Oil Limited
|
Full removal of Nelson Derrick
|
Nelson Derrick
DP (PDF,
1.94 MB, 32 pages)
|
|
Alba Northern Platform Topsides
|
Ithaca Oil and Gas Limited
|
Topsides will be removed and recovered to shore for reuse,
recycling or disposal.
|
Alba Topside DP
& EA (PDF, 4.12 MB, 38 pages)
|
|
Alba Floating Storage Unit, Mooring(s) and Riser Systems
|
Ithaca Oil and Gas Limited
|
Floating Storage Unit, Mooring(s) and Riser Systems to be
removed.
|
Alba FSU DP &
EA(PDF,
2.02 MB, 37 pages) Alba FSU CA
(PDF, 1.78
MB, 27 pages)
|
|
Tern Upper Jacket
|
TAQA Bratani Limited
|
The Tern Upper Jacket and pipeline risers will be cut to a
depth of approximately 132m below lowest astronomical tide
and recovered to shore for recycling or disposal.
|
Tern Upper Jacket -
DP (PDF,
3.98 MB, 50 pages) Tern Upper Jacket -
EA(PDF,
9.17 MB, 99 pages)
|
|
North Cormorant Upper Jacket
|
TAQA Bratani Limited
|
The North Cormorant Upper Jacket and pipeline risers will
be cut to a depth of approximately 116m below lowest
astronomical tide and recovered to shore for recycling or
disposal.
|
North Cormorant
Upper Jacket - DP(PDF, 3.52 MB, 48 pages)
North Cormorant
Upper Jacket - EA (PDF, 8.05 MB, 102 pages)
|
|
Pierce WI Wells
|
Enterprise Oil Limited
|
Full removal of A7z, A13Y, B4 wellheads and A8Z, B3, B4A
XTs and wellheads.
|
Pierce WI Wells
DP (PDF,
1.03 MB, 20 pages)
|
|
Trees Decommissioning Programmes (Birch, Larch &
Sycamore)
|
Spirit Energy North Sea Oil Limited
|
Full removal of all surface laid pipelines, exposed
stabilisation features and Birch and Larch Manifolds and
Sycamore wellhead. Trenched and/or buried pipelines,
pipelines in open trenches and stabilisation features
within trenches and below seabed will be left in situ.
|
Trees DP
(PDF, 2.63
MB, 63 pages) Trees
EA(PDF,
8.33 MB, 103 pages) Trees CA
(PDF, 2.77
MB, 50 pages)
|
|
Dunlin Alpha
|
Fairfield Betula Limited
|
Decommissioning in situ of Dunlin Alpha concrete gravity
based structure and storage cells.
|
Dunlin Alpha
Decommissioning Programme(PDF, 6.5 MB, 77 pages)
Dunlin Alpha
Decommissioning Comparative Assessment Report
(PDF, 3.66
MB, 133 pages) Dunlin Alpha
Decommissioning Environmental Appraisal (PDF, 6.58 MB, 176 pages)
|
|
Brae Alpha, Brae Bravo, Central Brae, West Brae and
Sedgwick
|
Marathon Oil UK LLC
|
Removal of Brae Alpha and Brae Bravo jackets to the top of
the footings. Removal of Central Brae, West Brae and
Sedgwick subsea installations. Pipelines to be
decommissioned in a variety of ways including removal,
trenching and leave in situ.
|
Brae Alpha, Brae
Bravo, Central Brae, West Brae and Sedgwick Decommissioning
Programmes(PDF, 15.3 MB, 120 pages)
Brae A etc,
Environmental Statement – Main Report (PDF, 14.6 MB, 80 pages)
Brae A etc.
Environmental Statement - Technical
Appendices(PDF, 13.3 MB, 96 pages)
Brae A Substructure
Comparative Assessment(PDF, 1.7 MB, 30 pages)
Brae B Substructure
Comparative Assessment (PDF, 1.59 MB, 30 pages)
Brae Area Subsea
Assets Comparative Assessment(PDF, 6.84 MB, 43 pages)
|
|
Brent
|
Shell U.K. Limited
|
Decommissioning in situ of Brent Bravo, Charlie and Delta
concrete gravity based structures.
|
Brent
Decommissioning Programme(PDF, 12 MB, 322 pages)
Brent
ES(PDF,
12.5 MB, 475 pages) Brent EIA
(PDF, 5.05
MB, 429 pages)Brent ES
Appendix (PDF, 2.52 MB, 45 pages) A
suite of detailed Technical Documents which support the
Decommissioning Programmes documents are available on the
Shell Website
|
|
Atlantic and Cromarty
|
BG Global Energy Limited and Hess Limited
|
Manifold and WHPS to be removed
for recycling/disposal. Partial removal of pipelines and
remaining section of buried/trenched pipelines to remain in
situ.
|
Atlantic &
Cromarty Decommissioning Programmes(PDF, 1.76 MB, 50
pages)Atlantic &
Cromarty Stakeholder Report (PDF, 1.11 MB, 32
pages)Atlantic &
Cromarty Environmental Impact Assessment(PDF, 4.5 MB, 109
pages)Atlantic &
Cromarty Comparative Assessment(PDF, 2.06 MB, 110 pages)
|
|
Approved decommissioning programmes
Decommissioning Programme and Approval Date
|
Operator at approval
|
Operator following licence / company change
|
Revision Details and Approval Date
|
Close out report and Date Accepted
|
|
Gannet Subsea Wells
GB01 and GF01 - Final DP(PDF, 1.08 MB, 25 pages)
September 2025
|
Shell U.K. Limited
|
-
|
-
|
-
|
|
Gryphon Alpha FPSO
and Riser Disconnection DP(PDF, 5.83 MB, 79
pages)September 2025
|
TotalEnergies E&P North Sea UK Limited
|
-
|
-
|
-
|
|
Amethyst Jackets and
Risers DP(PDF, 2.04 MB, 56
pages)Amethyst Jackets and
Risers EA(PDF, 6.02 MB, 113 pages)
August 2025
|
Perenco UK Limited
|
-
|
-
|
-
|
|
Calder, Dalton &
Millom (EIS) DP(PDF, 8.23 MB, 90 pages)
EIS
CA(PDF,
12 MB, 119 pages) EIS
EA(PDF,
9.31 MB, 231 pages) August 2025
|
Chrysaor Resources (Irish Sea) Limited
|
-
|
-
|
-
|
|
Davy North and Davy
East Subsea Installations DP(PDF, 2.05 MB, 45 pages)
Davy North and Davy
East Subsea Installations EA(PDF, 6.62 MB, 109 pages)
July 2025
|
Perenco UK Limited
|
-
|
-
|
-
|
|
Thistle Pipelines
& SALM Base DP(PDF, 7.87 MB, 67 pages)
Combined Thistle
& Don Pipelines CA(PDF, 9.03 MB, 123
pages)Combined Thistle
& Don Pipelines EA (PDF, 6.76 MB, 152
pages)July 2025
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Thistle Upper Jacket
and Associated Risers DP (PDF, 4.96 MB, 70
pages)July 2025
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Burghley DP
(PDF, 1.74
MB, 55 pages) Beauly and Burghley
CA (PDF,
3.08 MB, 74 pages) Beauly and Burghley
EA (PDF,
20 MB, 99 pages)June 2025
|
Repsol North Sea Limited
|
-
|
-
|
-
|
|
Beauly DP
(PDF, 1.85
MB, 49 pages) Beauly and Burghley
CA (PDF,
3.08 MB, 74 pages) Beauly and Burghley
EA (PDF,
20 MB, 99 pages)June 2025
|
Repsol North Sea Limited
|
-
|
-
|
-
|
|
Galahad DP
(PDF, 1.71
MB, 49 pages) Galahad EA
(PDF, 3.35
MB, 71 pages)June 2025
|
Perenco Gas (UK) Limited
|
-
|
-
|
-
|
|
Seven Seas WHPS
DP (PDF,
1.59 MB, 31 pages) June 2025
|
Spirit Energy Resources Limited
|
-
|
-
|
-
|
|
Don Pipelines in
Thistle 500m Safety Zone DP(PDF, 4.09 MB, 45 pages)
Final EA
(PDF, 6.76
MB, 152 pages)Don Comparative
Assessment (PDF, 8.88 MB, 123 pages)
May 2025
|
Britoil Limited
|
-
|
-
|
-
|
|
Wingate DP
(PDF, 6.27
MB, 59 pages) Wingate EA
(PDF, 28.9
MB, 107 pages)Wingate CA
(PDF, 4.17
MB, 42 pages) Wingate Pipeline
Survey(PDF, 1.33 MB, 10 pages)
May 2025
|
Wintershall Noordzee B.V.
|
-
|
-
|
-
|
|
LBA DP (MS Word
Document, 6.49 MB) LBA CA (MS Word
Document, 4.97 MB) LBA EA(MS Word
Document, 18.1 MB) May 2025
|
Eni UK Limited
|
-
|
-
|
-
|
|
Kilmar DP
(PDF, 5.35
MB, 54 pages) Kilmar CA
(PDF, 5.2 MB,
43 pages) Kilmar
EA(PDF,
8.66 MB, 110 pages) May 2025
|
Energean UK Ltd
|
-
|
1. Change of parties to the approved Programmes June
2025
|
-
|
|
Garrow DP.
(PDF, 6.64
MB, 53 pages) Garrow CA.
(PDF, 3.35
MB, 36 pages)Garrow EA.
(PDF, 8.07
MB, 105 pages) April 2025
|
Energean UK Ltd
|
-
|
1. Change of parties to the approved Programmes May
2025
|
-
|
|
Eider DP
(PDF, 5.29
MB, 52 pages) Eider
EA(PDF,
8.17 MB, 99 pages) March 2025
|
TAQA Bratani Limited
|
-
|
-
|
-
|
|
Solan DP
(PDF, 8.36
MB, 87 pages) Solan
CA(PDF,
6.19 MB, 65 pages) Solan
EA(PDF,
6.97 MB, 133 pages) March 2025
|
Premier Oil UK Limited
|
-
|
-
|
-
|
|
Otter Hatches
DP(PDF,
2.07 MB, 38 pages) January 2025
|
TAQA Bratani Limited
|
-
|
-
|
-
|
|
Guinevere Pipelines
DP(PDF,
3.72 MB, 47 pages) Guinevere Pipelines
EA (PDF,
4.3 MB, 103 pages) Guinevere Pipelines
CA(PDF,
2.71 MB, 63 pages) October 2024
|
Perenco Gas (UK) Limited
|
-
|
-
|
-
|
|
Durango DP
(PDF, 1.35
MB, 38 pages) Durango EA
(PDF, 3.77
MB, 82 pages)September 2024
|
Perenco North Sea Limited
|
-
|
-
|
-
|
|
East Brae Upper
Jacket (PDF, 1.96 MB, 50
pages)July 2024
|
TAQA Bratani Limited
|
-
|
1. Change of parties to the approved Programmes October
2024
|
-
|
|
Knarr Gas Pipeline
(KGP) Final DP(PDF, 2.49 MB, 56 pages)
Knarr Gas Pipeline
(KGP) Final CA(PDF, 1.83 MB, 48 pages)
Knarr Gas Pipeline
(KGP) Final EA (PDF, 3.12 MB, 74 pages)
May 2024
|
Gassco AS
|
-
|
-
|
Knarr Gas Pipeline
Close Out Report(PDF, 877 KB, 12
pages)July 2025
|
|
Rochelle WHPS and
Jumper DPs(PDF, 2.87 MB, 41 pages)
May 2024
|
CNOOC Petroleum Europe Limited
|
-
|
-
|
-
|
|
Leman 27H + 27J
Topsides DP (PDF, 3.36 MB, 80 pages)
April 2024
|
Perenco UK Limited
|
-
|
-
|
-
|
|
Trees Protection
Cages (Birch, Larch and Sycamore) DP(PDF, 2.59 MB, 38
pages)February 2024
|
Spirit Energy North Sea Oil Limited
|
-
|
-
|
-
|
|
Leman F & G
DP(PDF,
9.92 MB, 86 pages) Leman F & G
CA (PDF,
9.5 MB, 63 pages) Leman F & G
EA (PDF,
15.1 MB, 165 pages)January 2024
|
Shell U.K. Limited
|
-
|
-
|
-
|
|
Helvellyn
CA(PDF,
9.84 MB, 46 pages)Helvellyn
EA(PDF,
7.37 MB, 101 pages)Helvellyn
DP(PDF,
4.75 MB, 44 pages)January 2024
|
Waldorf Petroleum Resources Limited
|
-
|
-
|
-
|
|
Western Isles Subsea
Final DP(PDF, 9.34 MB, 75
pages)Western Isles Subsea
EA Final(PDF, 7.1 MB, 141 pages)
Western Isles Subsea
CA Final (PDF, 5.49 MB, 74
pages)October 2023
|
Dana Petroleum (E&P) Limited
|
-
|
1. Change of parties to the approved Programme September
2024
|
-
|
|
Devenick
(PDF, 2.24
MB, 54 pages) Devenick CA
(PDF, 2.02
MB, 58 pages)Devenick
EA(PDF,
6.14 MB, 127 pages)October 2023
|
Taqa Bratani Limited
|
-
|
-
|
-
|
|
Western Isles FPSO
DP (PDF,
5.78 MB, 65 pages)September 2023
|
Dana Petroleum (E&P) Limited
|
-
|
1. Change of parties to the approved Programme September
2024
|
-
|
|
Heather Pipelines
DP (PDF,
4.22 MB, 56 pages)Heather Pipelines
CA (PDF,
5.35 MB, 72 pages)Heather Pipelines
EA (PDF,
6.78 MB, 117 pages)September 2023
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Brent PLU6294 DP
(PDF, 1.08
MB, 37 pages)September 2023
|
Shell U.K. Limited
|
-
|
-
|
-
|
|
Chestnut Phase 2
DP (PDF,
5.6 MB, 57 pages)Chestnut Phase 2
EA (PDF,
7.97 MB, 104 pages)Chestnut Phase 2
CA (PDF,
4.42 MB, 67 pages)June 2023
|
Spirit Energy North Sea Oil Limited
|
-
|
-
|
-
|
|
Heather Upper Jacket
DP (PDF,
3.24 MB, 41 pages) March 2023
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Saltire A Topsides
and Saltire Area Subsea Infrastructure DPs
(PDF, 7.37
MB, 69 pages)Saltire EA
(PDF, 7.09
MB, 109 pages) Saltire
CA(PDF,
4.61 MB, 111 pages)December 2022
|
Repsol Sinopec Resources UK Limited
|
-
|
-
|
-
|
|
Causeway & Fionn
DP (PDF,
4.56 MB, 64 pages) Causeway & Fionn
EA (PDF,
6.78 MB, 94 pages) Causeway & Fionn
CA (PDF,
2.03 MB, 41 pages) December 2022
|
Ithaca Energy (UK) Limited
|
-
|
-
|
-
|
|
Johnston
DP(PDF,
2.18 MB, 43 pages)Johnston
EA(PDF,
5.25 MB, 121 pages)Johnston
CA(PDF,
1.64 MB, 62 pages)December 2022
|
Premier Oil E&P UK EU Limited
|
-
|
-
|
-
|
|
Duart DP
(PDF, 11.2
MB, 55 pages) Tartan Subsea EA
(PDF, 36.4
MB, 137 pages) Tartan Subsea CA
(PDF, 5.5 MB,
135 pages) November 2022
|
Repsol Sinopec Resources UK Limited
|
-
|
-
|
-
|
|
Tartan N Terrace
(TNT) & Tartan Satellite (TS) Subsea
DPs(PDF,
4.07 MB, 72 pages) Tartan Subsea EA
(PDF, 36.4
MB, 137 pages) Tartan Subsea CA
(PDF, 5.5 MB,
135 pages) November 2022
|
Repsol Sinopec Resources UK Limited
|
-
|
-
|
-
|
|
Tartan Topsides
DP (PDF,
8.28 MB, 46 pages)Tartan Subsea
EA(PDF,
36.4 MB, 137 pages)November 2022
|
Repsol Sinopec Resources UK Limited
|
-
|
-
|
-
|
|
Lancaster Field
Floating Production Storage and Offloading Vessel (FPSO)
Decommissioning Programme (PDF, 2.51 MB, 37
pages)November 2022
|
Hurricane Energy PLC
|
-
|
-
|
-
|
|
Hewett Area Subsea
Installations DP(PDF, 4.45 MB, 54
pages)Hewett Area Subsea
Installations EA(PDF, 14.8 MB, 150
pages)November 2022
|
Eni UK Limited
|
-
|
1. Include mattresses and grout bags into the DP
February 2025
|
-
|
|
Scoter and Merganser
DP(PDF,
4.63 MB, 92 pages) Scoter and Merganser
CA (PDF,
1.94 MB, 47 pages)Scoter and Merganser
EA(PDF,
6.4 MB, 130 pages)September 2022
|
Shell UK Limited
|
-
|
-
|
-
|
|
Sean DP
(PDF, 5.05
MB, 64 pages) Sean
CA(PDF,
2.8 MB, 110 pages) Sean EA
(PDF, 9.44
MB, 171 pages)August 2022
|
ONE-Dyas UK Limited
|
-
|
-
|
-
|
|
Caister CDP1b
(PDF, 5.96
MB, 56 pages) CMS Area EA
(PDF, 10.4
MB, 171 pages) CMS Area CA
(PDF, 13.5
MB, 145 pages)July 2022
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Caister-Murdoch
System CDP2 (PDF, 15.7 MB, 131 pages)
CMS Area EA
(PDF, 10.4
MB, 171 pages) CMS Area CA
(PDF, 13.5
MB, 145 pages)July 2022
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Murdoch
CDP3(PDF,
8.53 MB, 83 pages) CMS Area EA
(PDF, 10.4
MB, 171 pages) CMS Area CA
(PDF, 13.5
MB, 145 pages)July 2022
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Brae Bravo Upper
Jacket Decommissioning Programme (PDF, 1.76 MB, 41 pages)
June 2022
|
TAQA Bratani Limited
|
-
|
-
|
-
|
|
LOGGS Saturn
Satellites LDP2(PDF, 20 MB, 90 pages)
LOGGS LDP2 - LDP5
Comparative Assessment(PDF, 3.21 MB, 203
pages)LOGGS LDP2 - LDP5
EA (PDF,
7.5 MB, 181 pages) June 2022
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Foinaven FPSO
Offstation DP(PDF, 3.76 MB, 60 pages)
May 2022
|
Britoil Limited
|
-
|
-
|
-
|
|
LOGGS V-Fields
LDP4 (PDF, 20.8 MB, 83
pages)LOGGS LDP2 - LDP5
Comparative Assessment(PDF, 3.21 MB, 203
pages)LOGGS LDP2 - LDP5
EA (PDF,
7.5 MB, 181 pages) April 2022
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Hummingbird Spirit
FPSO Sail away and Chestnut Riser
Disconnection(PDF, 2.96 MB, 47 pages)
March 2022
|
Spirit Energy North Sea Oil Limited
|
-
|
-
|
Hummingbird Spirit
FPSO and Riser Disconnect Close Out Report
(PDF, 4.25
MB, 39 pages) July 2025
|
|
Victoria DP
(PDF, 2.54
MB, 42 pages) Victoria CA
(PDF, 1.81
MB, 48 pages)Victoria EA
(PDF, 18.4
MB, 158 pages) April 2022
|
NEO Energy (SNS) Limited
|
-
|
-
|
-
|
|
Wenlock
DP(PDF,
4.72 MB, 51 pages)Wenlock
CA(PDF,
3.84 MB, 44 pages)Wenlock
EA(PDF,
6.74 MB, 119 pages)February 2022
|
Alpha Petroleum Resources Limited
|
Energean UK Ltd
|
-
|
-
|
|
Cormorant Alpha
Topsides DP(PDF, 3.91 MB, 81
pages)Cormorant Alpha
Topsides EA(PDF, 8.21 MB, 117
pages)February 2022
|
TAQA Bratani Limited
|
-
|
-
|
-
|
|
Caledonia
Decommissioning Programme(PDF, 3.1 MB, 50 pages)
Caledonia
Comparative Assessment(PDF, 2.04 MB, 64
pages)Caledonia
Environmental Assessment(PDF, 5.56 MB, 113
pages)February 2022
|
Premier Oil UK Limited
|
-
|
-
|
-
|
|
Thistle Topsides
Decommissioning Programme(PDF, 3.11 MB, 38 pages)
December 2021
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Indefatigable 18A
Topsides DP(PDF, 1.29 MB, 50
pages)December 2021
|
Perenco UK Limited
|
-
|
-
|
-
|
|
Banff and Kyle
Decommissioning Programmes(PDF, 3.23 MB, 71 pages)
Banff and Kyle
Environmental Appraisal (PDF, 7.07 MB, 114 pages)
Banff and Kyle
Comparative Assessment(PDF, 2.75 MB, 106
pages)November 2021
|
CNR International (U.K.) Limited
|
-
|
-
|
-
|
|
Ensign installation
DP(PDF,
2.52 MB, 37 pages) Ensign Pipelines
DP(PDF,
1.99 MB, 42 pages) Ensign CA
(PDF, 1.67
MB, 48 pages)Ensign EA
(PDF, 9.45
MB, 134 pages) August 2021
|
Spirit Energy North Sea Limited
|
-
|
-
|
-
|
|
Conrie, Don SW, W
Don and Ythan Decommissioning Programmes(PDF, 7.29 MB, 88 pages)
Don SW and W Don
Comparative Assessment(PDF, 5.33 MB, 76 pages)
Conrie, Don SW, W
Don and Ythan Environmental Appraisal (PDF, 8.07 MB, 132 pages)
August 2021
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Fulmar and Auk North
Topsides, Subsea Facilities and Pipelines Decommissioning
Programme(PDF, 3.83 MB, 78 pages)
Fulmar and Auk North
Subsea Infrastructure and Pipelines Comparative
Assessment(PDF, 4.63 MB, 144
pages)Fulmar & Auk
North Environmental Appraisal (PDF, 5.17 MB, 114 pages)
July 2021
|
Repsol Sinopec Resources UK Limited
|
-
|
-
|
-
|
|
Heather Topsides
Decommissioning Programme(PDF, 4.07 MB, 43 pages)
July 2021
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Kingfisher
Decommissioning Programme(PDF, 2.95 MB, 76
pages)Kingfisher
CA(PDF,
2.19 MB, 51 pages) Kingfisher EA
(PDF, 3.48
MB, 119 pages)June 2021
|
Shell U.K. Limited
|
-
|
1. Change of parties to the approved Programme August 2021
2. Schedule Extension to 31/12/2027 and further change to
parties to the approved Programme February 2025
|
-
|
|
Gaupe
Decommissioning Programme(PDF, 1.86 MB, 47 pages)
Gaupe CA
(PDF, 1.32
MB, 51 pages)Gaupe EA
(PDF, 5.77
MB, 113 pages) May 2021
|
A/S Norske Shell
|
-
|
1. Change of parties to the approved decommissioning
programme. 2. Change of decommissioning solution for PLU
2784 and PLU 2785 from leave in situ to full removal due to
insufficient depth of cover. December 2024
|
-
|
|
PL301 Heimdal to
Brae Pipeline Decommissioning Programme(PDF, 7.71 MB, 53 pages)
PL301 Heimdal to
Brae Pipeline Comparative Assessment(PDF, 6.77 MB, 55 pages)
PL301 Heimdal to
Brae Environmental Appraisal (PDF, 9.64 MB, 114 pages)
April 2021
|
Equinor Energy AS
|
-
|
-
|
-
|
|
Hunter & Rita
Decommissioning Programme(PDF, 2.1 MB, 44 pages)
Hunter & Rita
CA (PDF,
1.99 MB, 79 pages) Hunter & Rita
EA (PDF,
4.96 MB, 131 pages) April 2021
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
LOGGS PR, LOGGS PC,
LOGGS PP, LOGGS PA, North Valiant PD, & Associated
Pipelines – LDP5(PDF, 12.2 MB, 99 pages)
|
Chrysaor Production (U.K.) Limited April 2021
|
-
|
-
|
-
|
|
Windermere
DP(PDF,
1.95 MB, 41 pages)Windermere
CA(PDF,
802 KB, 34 pages)Windermere
ES(PDF,
7.86 MB, 231 pages) March 2021
|
INEOS UK SNS Limited
|
-
|
1. Schedule Extension to 31/12/2025 & Change to decom
solution for covering pipeline ends to use rock rather than
backfill January 2024
|
-
|
|
Hewett Installation
DP(PDF,
5.76 MB, 69 pages)Hewett EA
(PDF, 16.9
MB, 134 pages) March 2021
|
ENI Hewett Limited
|
-
|
-
|
|
|
Buchan & Hannay
Decommissioning Programme(PDF, 3.33 MB, 57
pages)Buchan & Hannay
CA (PDF,
3.83 MB, 91 pages)Buchan & Hannay
EA (PDF,
8.29 MB, 115 pages)March 2021
|
Repsol Sinopec Resources UK Limited
|
-
|
-
|
-
|
|
Huntington
Decommissioning Programme(PDF, 2.52 MB, 41
pages)Huntington
CA(PDF,
1.86 MB, 62 pages)Huntington
EA(PDF,
5.01 MB, 127 pages) March 2021
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
Northern Producer
FPF and Don SW + W Don riser disconnection(PDF, 4.89 MB, 58 pages)
March 2021
|
Submitted jointly by Qualimar Shipping Company Limited and
EnQuest Heather Limited
|
-
|
-
|
Northern Producer
Close Out Report(PDF, 5.79 MB, 45
pages)July2024
|
|
Balmoral
Decommissioning Programme(PDF, 4.27 MB, 65
pages)Balmoral Area
CA(PDF,
2.56 MB, 116 pages)Balmoral Area
EA(PDF,
8.03 MB, 196 pages)February 2021
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
Brenda
Decommissioning Programme(PDF, 1.76 MB, 47
pages)February 2021
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
Glamis
Decommissioning Programme(PDF, 2.53 MB, 46
pages)February 2021
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
Nicol
Decommissioning Programme(PDF, 1.68 MB, 45
pages)February 2021
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
Stirling
Decommissioning Programme(PDF, 3.13 MB, 44
pages)February 2021
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
Topaz
Decommissioning Programme(PDF, 2.21 MB, 31 pages)
Topaz
CA(PDF,
504 KB, 15 pages) Topaz
EA(PDF,
1.22 MB, 37 pages)February 2021
|
INEOS UK SNS Limited
|
-
|
1. Schedule Extension to 31/12/2025 & Change to decom
solution for covering pipeline ends to use rock rather than
backfill January 2024
|
-
|
|
North Cormorant
DP (PDF,
2.56 MB, 50 pages)North Cormorant
EA (PDF,
7.26 MB, 93 pages)November 2020
|
TAQA Bratani Limited
|
-
|
-
|
-
|
|
Tern Topsides -
Decommissioning Programme(PDF, 2.84 MB, 52 pages)
Tern Topsides
EA(PDF,
7.03 MB, 91 pages)November 2020
|
TAQA Bratani Limited
|
-
|
-
|
-
|
|
Fulmar & Auk
North Preparation Work Scopes Decommissioning
Programme(PDF, 1.53 MB, 35
pages)November 2020
|
Repsol Sinopec North Sea Limited
|
-
|
-
|
-
|
|
East Brae Topsides
and Braemar Decommissioning Programmes(PDF, 3.88 MB, 62
pages)September 2020
|
RockRose UKCS8 LLC
|
TAQA Bratani Limited
|
-
|
-
|
|
Brent Alpha
Jacket (PDF, 2.82 MB, 101 pages)
July 2020
|
Shell U.K. Limited
|
-
|
-
|
-
|
|
Amethyst A1D, A2D,
B1D & C1D Topsides (PDF, 2.42 MB, 43 pages)
July 2020
|
Perenco UK Limited
|
-
|
-
|
-
|
|
Anglia
Decommissioning Programme(PDF, 2.18 MB, 61 pages)
Anglia CA
(PDF, 3.74
MB, 49 pages)Anglia EA
(PDF, 5.83
MB, 120 pages) June 2020
|
Ithaca Energy UK Limited
|
-
|
-
|
-
|
|
Brynhild
Pipelines (PDF, 1.98 MB, 50 pages)
June 2020
|
Lundin Energy Norway AS
|
Aker BP ASA
|
-
|
Brynhild Pipelines
Close Out Report(PDF, 2.86 MB, 25
pages)March 2024
|
|
Cormorant Alpha
Derrick Structure Removal (PDF, 4.28 MB, 57 pages)
June 2020
|
TAQA Bratani Limited
|
-
|
-
|
Cormorant Alpha
Derrick Structure Removal Close Out Report(PDF, 5.17 MB, 38
pages)December 2023
|
|
Cavendish
(PDF, 2.4 MB,
40 pages) June 2020
|
INEOS UK SNS Limited
|
-
|
1. Schedule Extension to 31/12/2024 August 2022 2. Schedule
Extension to 31/12/2025 & Change to decom solution for
covering pipeline ends to use rock rather than backfill
January 2024
|
-
|
|
Banff and Kyle FPSO
and FSO Float Off (PDF, 3.45 MB, 39 pages)
May 2020
|
CNR International (U.K.) Limited
|
-
|
-
|
Banff and Kyle FPSO
and FSO Float Off Interim Close Out Report(PDF, 2.31 MB, 36
pages)May 2021
|
|
Eider Topsides
DP (PDF,
2.38 MB, 50 pages)May 2020
|
TAQA Bratani Limited
|
-
|
-
|
-
|
|
Ganymede, Europa,
Callisto and NW Bell – LDP3 (PDF, 4.85 MB, 101
pages)May 2020
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Ganymede ZD Topsides
- LDP3b(PDF, 2.31 MB, 46 pages)
April 2020
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Huntington FPSO
(Voyageur Spirit)(PDF, 1.19 MB, 21 pages)
April 2020
|
Premier Oil E&P UK Limited
|
-
|
-
|
-
|
|
Caister - CDP1a
(PDF, 2.93
MB, 49 pages) March 2020
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Alma & Galia
DPs(PDF,
4.34 MB, 61 pages) March 2020
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Brent Field
Pipelines (PDF, 4.05 MB, 130 pages)
March 2020
|
Shell U.K. Limited
|
-
|
-
|
-
|
|
Thistle COS
Tanks (PDF, 3.34 MB, 59
pages)January 2020
|
EnQuest Heather Limited
|
-
|
-
|
-
|
|
Banff SAL
Buoy(PDF,
996 KB, 20 pages)November 2019
|
CNR International (U.K.) Limited. Decommissioning
Programmes submitted by Teekay Petrojarl Floating
Production UK Ltd.
|
-
|
-
|
Banff SAL Buoy
Interim Close Out Report (PDF, 1.22 MB, 12
pages)May 2021
|
|
MacCulloch
Decommissioning Programmes(PDF, 1.36 MB, 40
pages)November 2019
|
Chrysaor Production (U.K.) Limited
|
-
|
-
|
-
|
|
Goldeneye
(PDF, 3.41
MB, 53 pages) November 2019
|
Shell U.K. Limited
|
-
|
-
|
Goldeneye Close out
Report (PDF, 1.95 MB, 35 pages)
July 2024
|
|
Brae Alpha West
Drilling Rig (PDF, 2.2 MB, 24
pages)September 2019
|
RockRose Energy UKCS8 LLC
|
TAQA Bratani Limited
|
1. Schedule Extension to 31/12/2023 January 2022
|
Brae Alpha West
Drilling Rig Close Out Report (PDF, 1.68 MB, 24 pages)
April 2024
|
|
South Morecambe
DP3/DP4 (PDF, 2.72 MB, 57
pages)September 2019
|
Spirit Energy Production UK Limited
|
-
|
-
|
-
|
|
Pickerill A&B
Installations(PDF, 1.79 MB, 54
pages)September 2019
|
Perenco Gas (UK) Limited
|
-
|
1. Schedule Extension to 31/12/2024 February 2022 2.
Schedule Extension to 31/12/2027 March 2025
|
-
|
|
Minke
Decommissioning Programmes(PDF, 8.56 MB, 59
pages)September 2019
|
Neptune E&P UKCS Limited
|
-
|
1. Schedule Extension to 31/12/2024 July 2021 2. Schedule
Extension to 31/12/2025 April 2025
|
-
|
|
Ketch
(PDF, 2.65
MB, 60 pages)August 2019
|
DNO North Sea (ROGB) Limited
|
-
|
1. Allow for installation of UKNG Viking Cable & Change
in decom solution of pipelines to full removal June 2022 2.
Include pipeline and fibre optic crossings into DP &
Change in decom solution for pipelines remaining under rock
berms & additional rock dump on pipeline ends September
2022 3. To alter the S29Holders November 2023 4. Change in
decom solution of pipeline sections to leave in situ May
2024
|
-
|
|
Schooner
(PDF, 4.97
MB, 63 pages) August 2019
|
DNO North Sea (ROGB) Limited
|
-
|
1. Allow for installation of UKNG Viking Cable June 2022 2.
To alter the S29Holders November 2023 3. Addition of
WHPS
to DP and its removal & Change in decom solution of
exposed pipeline sections to full removal May 2024
|
-
|
|
Juliet DP
(PDF, 6.16
MB, 47 pages) August 2019
|
Neptune E&P UKCS Limited
|
-
|
1. Schedule Extension to 31/12/2024 July 2021 2. Schedule
Extension to 31/12/2025 April 2025
|
-
|
|
Dunlin Alpha to
Cormorant Alpha Pipeline - PL5(PDF, 4.36 MB, 73 pages)
July 2019
|
Fairfield Betula Limited
|
-
|
-
|
PL5 Close Out
Report (PDF, 4.74 MB, 27 pages)
February 2021
|
|
Ninian Northern
Platform (PDF, 2.34 MB, 70 pages)
|
CNR International (U.K.) Limited June 2019
|
-
|
-
|
-
|
|
Nevis N11
WHPS(PDF,
1.66 MB, 26 pages) June 2019
|
Apache Beryl I Limited
|
-
|
-
|
Nevis N11 WHPS Close
out report(PDF, 1.86 MB, 25
pages)September 2022
|
|
Dunlin Alpha
Topsides (PDF, 4.97 MB, 44 pages)
May 2019
|
Fairfield Betula Limited
|
-
|
-
|
Dunlin Alpha
Topsides Close Out Report (PDF, 1.63 MB, 36
pages)September 2024
|
|
Hewett Vent Stack
DP (PDF,
1.5 MB, 21 pages)April 2019
|
Eni Hewett Limited
|
ENI UK Limited
|
-
|
Hewett Vent Stack
Close Out Report (PDF, 595 KB, 11
pages)September 2021
|
|
Pickerill A &
B(PDF,
1.26 MB, 21 pages) March 2019
|
Perenco Gas (UK) Limited
|
-
|
-
|
-
|
|
Curlew B, C and
D (PDF,
2.4 MB, 61 pages) March 2019
|
Shell U.K. Limited
|
-
|
1. Schedule Extension to 31/12/2026 August 2023
|
-
|
|
Viking Platforms,
Vixen and associated Pipelines (VDP2)(PDF, 33.3 MB, 84
pages)January 2019
|
ConocoPhillips (U.K.) Limited
|
-
|
-
|
-
|
|
Victor
(VDP3)(PDF, 21.1 MB, 55 pages)
January 2019
|
ConocoPhillips (U.K.) Limited
|
-
|
-
|
-
|
|
Tyne South
Installations(PDF, 1.83 MB, 42
pages)January 2019
|
Perenco UK Limited
|
-
|
-
|
-
|
|
Guinevere
Installation (PDF, 2.05 MB, 43 pages)
January 2019
|
Perenco UK Limited
|
-
|
-
|
-
|
|
Beatrice
Decommissioning Programmes(PDF, 4.45 MB, 88
pages)January 2019
|
Repsol Sinopec Resources UK Limited
|
-
|
1. Terminate agreement for Beatrice AD, AP, B & C reuse
July 2019
|
-
|
|
Bains
Decommissioning Programmes(PDF, 2.57 MB, 36
pages)January 2019
|
Spirit Energy Production UK Limited
|
-
|
-
|
-
|
|
Jacky
(PDF, 2.34
MB, 52 pages)October 2018
|
Ithaca Energy (UK) Limited
|
-
|
1. Schedule Extension to 31/12/2024 and change to decom
solution August 2023 2. Schedule Extension to 31/12/2030.
December 2024
|
-
|
|
Brae Bravo Topsides,
Flare Bridge, Flare Tower and Flare Jacket and
Substructure(PDF, 4.9 MB, 52 pages)
August 2018
|
Marathon Oil UK LLC
|
TAQA Bratani Limited
|
-
|
Brae Bravo Topsides
Close Out Report (PDF, 3.29 MB, 36 pages)
January 2024
|
|
Brent Alpha, Bravo
and Charlie Topsides (PDF, 3.34 MB, 81 pages)
August 2018
|
Shell U.K. Limited
|
-
|
-
|
-
|
|
Stirling A33 WHPS
Decommissioning Programme(PDF, 1.13 MB, 27 pages)
May 2018
|
Premier Oil E&P UK Limited
|
-
|
-
|
Stirling WHPS Close
Out Report(PDF, 2.57 MB, 15
pages)February 2019
|
|
Ann and
Alison(PDF, 2.98 MB, 60 pages)
April 2018
|
Spirit Energy North Sea Limited
|
-
|
-
|
-
|
|
Saturn
(Annabel)(PDF, 2.49 MB, 47 pages)
April 2018
|
Spirit Energy North Sea Limited
|
-
|
-
|
-
|
|
Audrey
(PDF, 2.87
MB, 58 pages) April 2018
|
Spirit Energy North Sea Limited
|
-
|
-
|
-
|
|
Rev Decommissioning
Programme(PDF, 12 MB, 42 pages)
April 2018
|
Repsol Norge AS
|
-
|
1. Schedule Extension to 31/12/2023 November 2019. 2.
Schedule Extension to 31/12/2027 February 2023
|
-
|
|
Markham
ST-1(PDF,
2.39 MB, 49 pages)February 2018
|
Centrica Production Nederland B.V.
|
Spirit Energy Nederland B.V.
|
-
|
Markham ST-1 Close
Out Report(PDF, 6.19 MB, 68 pages)
July 2021
|
|
Osprey
(PDF, 3.92
MB, 68 pages) December 2017
|
Fairfield Fagus Limited
|
-
|
-
|
Osprey Close Out
Report (PDF, 1.71 MB, 34
pages)January 2021
|
|
Merlin
(PDF, 2.97
MB, 56 pages)December 2017
|
Fairfield Fagus Limited
|
-
|
-
|
Merlin Close Out
Report (PDF, 1.47 MB, 27
pages)January 2021
|
|
Dunlin Fuel Gas
Import (DFGI) and Dunlin Power Import
(DPI)(PDF,
3.48 MB, 54 pages)December 2017
|
Fairfield Fagus Limited
|
-
|
-
|
DFGI/DPI Close Out
Report (PDF, 2.19 MB, 30 pages)
January 2021
|
|
Viking Satellites
CD, DD, ED, GD, HD Pipelines(PDF, 6.77 MB, 32
pages)November 2017
|
ConocoPhillips (U.K.) Limited
|
-
|
-
|
-
|
|
LOGGS Satellites
Vulcan UR, Viscount VO, Vampire OD - LDP1 (PDF, 17.5 MB, 61
pages)November 2017
|
ConocoPhillips (U.K.) Limited
|
-
|
-
|
-
|
|
Leman BH
Decommissioning Programme(PDF, 4.66 MB, 46 pages)
April 2017
|
Shell U.K. Limited
|
-
|
-
|
Leman BH Close Out
Report (PDF, 1.71 MB, 25 pages)
March 2019
|
|
Ettrick and
Blackbird (PDF, 2.1 MB, 62 pages)
March 2017
|
Nexen Petroleum U.K Limited
|
-
|
1. Schedule Extension to 31/12/2023 July 2020 2. Schedule
Extension to 31/12/2025 (Ettrick Inst only) December 2022
3. Schedule Extension to 31/12/2026 August 2025
|
-
|
|
Ann A4
Decommissioning Programme(PDF, 1.37 MB, 29
pages)February 2017
|
Centrica North Sea Limited
|
-
|
-
|
-
|
|
Janice James &
Affleck (PDF, 3.8 MB, 115
pages)September 2016
|
Maersk Oil UK Limited
|
-
|
1. Change of parties to the approved Programmes Affleck PLs
only December 2021
|
-
|
|
Athena
Decommissioning Programmes(PDF, 3.88 MB, 70
pages)September 2016
|
Ithaca Energy (UK) Limited
|
-
|
1. Schedule Extension to 31/12/2023 and change of parties
to the approved Programmes January 2021
|
-
|
|
Viking
Platforms(PDF, 3.53 MB, 40
pages)September 2016
|
ConocoPhillips (U.K.) Limited
|
-
|
-
|
-
|
|
Leadon
(PDF, 1.71
MB, 53 pages)March 2016
|
Maersk Oil North Sea UK Limited
|
TotalEnergies E&P UK Limited
|
-
|
Leadon Close Out
Report (PDF, 7.78 MB, 31 pages)
February 2023
|
|
Harding
STL(PDF,
2.61 MB, 73 pages)December 2015
|
TAQA Bratani Limited
|
-
|
-
|
Harding STL
Close-Out Report(PDF, 1.62 MB, 26 pages)
June 2017
|
|
Thames Area – Horne
& Wren (PDF, 1.57 MB, 48
pages)November 2015
|
Tullow Oil SK Limited
|
-
|
-
|
-
|
|
Thames Area –
Orwell (PDF, 828 KB, 42
pages)November 2015
|
Tullow Oil SK Limited
|
-
|
-
|
-
|
|
Thames Area –
Wissey (PDF, 1.26 MB, 43 pages)
November 2015
|
Tullow Oil SK Limited
|
-
|
-
|
-
|
|
Thames Area – Thames
Complex (PDF, 15.9 MB, 76
pages)October 2015
|
Perenco UK Limited
|
-
|
1. Removal of pipeline from the programme March 2018 2.
Schedule Extension to 31/12/2023 March 2019 3. Schedule
Extension to 31/12/2024 and Change in decom solution of
mats to leave in situ. July 2024
|
-
|
|
Thames Area –
Gawain (PDF, 3.8 MB, 47
pages)October 2015
|
Perenco UK Limited
|
-
|
1. Schedule Extension to 31/12/2022 March 2019 2. Schedule
Extension to 31/12/2024 September 2022 3. Schedule
Extension to 31/12/2027 and Change in decom solution of
mats to leave in situ. August 2025
|
-
|
|
Thames Area –
Arthur (PDF, 4.41 MB, 46
pages)October 2015
|
Perenco UK Limited
|
-
|
1. Schedule Extension to 31/12/2022 March 2019 2. Schedule
Extension to 31/12/2024 March 2022 3. Schedule Extension to
31/12/2026 April 2025
|
-
|
|
Brent - Brent Delta
Topside(PDF, 3.55 MB, 72 pages)
July 2015
|
Shell U.K. Limited
|
-
|
-
|
Brent Delta Topside
Close Out Report (PDF, 4.42 MB, 53 pages)
February 2020
|
|
Rose DP
(PDF, 2.87
MB, 42 pages) May 2015
|
Centrica Resources Limited
|
-
|
-
|
Rose Close Out
Report (PDF, 3.31 MB, 36 pages)
October 2018
|
|
Stamford
(PDF, 2.71
MB, 39 pages) April 2015
|
Centrica North Sea Gas Limited
|
-
|
-
|
Stamford Close Out
Report (PDF, 2.66 MB, 36 pages)
February 2019
|
|
Murchison
(PDF, 2.37
MB, 70 pages) August 2014
|
CNR
|
-
|
-
|
-
|
|
Rubie &
Renee(PDF, 2.47 MB, 50 pages)
April 2014
|
Endeavour Energy UK Limited
|
-
|
1. Schedule Extension to 31/12/2017 June 2016 2. Schedule
Extension to 31/12/2018 November 2017 3. Schedule Extension
to 31/12/2020 December 2018
|
Rubie Renee
Decommissioning Close Out Report(PDF, 9.98 MB, 66
pages)September 2021
|
|
Miller
(PDF, 6.57
MB, 198 pages)December 2013
|
BP Exploration (Alpha) Limited
|
-
|
1. Schedule Extension to 31/12/2024 December 2018
|
-
|
|
Schiehallion &
Loyal Phase One(PDF, 1.84 MB, 60 pages)
April 2013
|
Britoil Limited
|
-
|
-
|
Schiehallion &
Loyal Phase One Close Out Report(PDF, 1010 KB, 22 pages)
May 2019
|
|
IVRR -
decommissoning programme(PDF, 1.57 MB, 102
pages)February 2013
|
Hess Limited
|
-
|
-
|
IVRR Close Out
Report (PDF, 4.74 MB, 35 pages)
December 2015
|
|
Camelot
(PDF, 488 KB,
39 pages) June 2012
|
Energy Resource Technology (UK) Limited
|
-
|
-
|
Camelot Close out
report (PDF, 2.27 MB, 41 pages)
August 2013
|
|
Fife, Flora, Fergus,
Angus: decommissioning programme(PDF, 8.36 MB, 135
pages)February 2012
|
Hess Limited
|
-
|
-
|
FFFA Close Out
Report (PDF, 1.49 MB, 33 pages)
December 2014
|
|
Don
(PDF, 8 MB,
175 pages) May 2011
|
Britoil Public Limited Company
|
-
|
-
|
-
|
|
Welland
DP(PDF,
1.74 MB, 39 pages)September 2010
|
Perenco UK Limited
|
-
|
-
|
Welland Close Out
Report (PDF, 7.42 MB, 130
pages)September 2020
|
|
Tristan NW
DP(PDF,
4.11 MB, 119 pages)August 2010
|
Silverstone Energy Limited
|
Bridge Energy UK Limited
|
-
|
Tristan NW close out
report (PDF, 2.3 MB, 23 pages)
January 2011
|
|
Shelley DP
(PDF, 3.23
MB, 83 pages) June 2010
|
Premier Oil
|
-
|
-
|
Shelley close out
report (PDF, 4.49 MB, 62 pages)
February 2012
|
|
Kittiwake Sal
DP(PDF,
4.28 MB, 87 pages) June 2009
|
Venture North Sea Oil Limited
|
-
|
-
|
Kittiwake Sal close
out report(PDF, 588 KB, 13 pages)
July 2012
|
|
MCP-01 DP
(PDF, 7.41
MB, 336 pages)September 2007
|
Total E&P UK Limited
|
-
|
-
|
MCP-01 close out
report (PDF, 23.1 MB, 113
pages)March 2013
|
|
Kittiwake Buoy
DP (PDF,
3.46 MB, 118 pages)May 2008
|
Venture North Sea Oil Limited
|
-
|
1. Change of parties to the approved Programme August 2016
|
-
|
|
Linnhe
(PDF, 2.25
MB, 66 pages) July 2008
|
Mobil North Sea LLC
|
-
|
-
|
Linnhe Close Out
Report (PDF, 1000 KB, 22 pages)
November 2013
|
|
Indefatigable
(Shell) (PDF, 11.6 MB, 224
pages)May 2007
|
Shell UK Limited
|
-
|
-
|
Close Out
Report(PDF, 2.47 MB, 64
pages)December 2014
|
|
NW Hutton:
decommissioning programme(PDF, 14.9 MB, 320
pages)February 2006
|
Amoco (U.K.) Exploration Company - now a subsidiary of BP
plc
|
-
|
-
|
Close Out
Report(PDF, 2.52 MB, 32
pages)October 2014
|
|
Ardmore 2005
|
British American Offshore Limited
|
-
|
-
|
-
|
|
Ardmore 2005
|
Ugland Nordic Shipping AS
|
-
|
-
|
-
|
|
Ardmore 2005
|
Acorn Oil & Gas Limited
|
-
|
-
|
-
|
|
Brent Flare
DP(PDF,
2.93 MB, 122 pages) 2004
|
Shell
|
-
|
-
|
Brent Flare Close
out Report (PDF, 2.7 MB, 31 pages)
May 2025
|
|
Beatrice 2004
|
Talisman Energy (UK) Limited
|
-
|
-
|
-
|
|
Forbes and Gordon 2003
|
BHP Billiton
|
-
|
-
|
May 2005
|
|
Frigg DP
(PDF, 10 MB,
450 pages)May 2003
|
Total E&P Norge AS
|
-
|
-
|
Frigg close out
report (PDF, 3.46 MB, 62 pages)
May 2011
|
|
Durwood and Dauntless 2002
|
Amerada Hess
|
-
|
-
|
-
|
|
Hutton 2002
|
Kerr McGee
|
-
|
-
|
July 2004
|
|
Camelot CB 2001
|
ExxonMobil
|
-
|
-
|
-
|
|
Blenheim and Bladon 2000
|
Talisman
|
-
|
-
|
-
|
|
Durwood and Dauntless 2000
|
Amerada Hess
|
-
|
-
|
-
|
|
Maureen and Moira 2000
|
Phillips
|
-
|
-
|
-
|
|
Brent Spar 1998
|
Shell
|
-
|
-
|
-
|
|
Donan 1998
|
BP
|
-
|
-
|
-
|
|
Fulmar SALM 1998
|
Shell
|
-
|
-
|
-
|
|
Emerald 1996
|
MSR
|
-
|
-
|
-
|
|
Frigg FP 1996
|
Elf Norge
|
TotalFinaElf Norge
|
-
|
-
|
|
Leman BK 1996
|
Shell
|
-
|
-
|
-
|
|
Staffa 1996
|
Lasmo
|
-
|
-
|
-
|
|
Viking AC, AD, AP & FD 1996
|
Conoco
|
-
|
-
|
-
|
|
Esmond CP & CW 1995
|
BHP
|
-
|
-
|
-
|
|
Gordon BW 1995
|
BHP
|
-
|
-
|
-
|
|
Angus 1993
|
Amerada Hess
|
-
|
-
|
-
|
|
Forbes AW 1993
|
Hamilton
|
BHP
|
-
|
-
|
|
Argyll, Duncan and Innes 1992
|
Hamilton
|
BHP
|
-
|
-
|
|
Blair 1992
|
Sun Oil
|
AGIP
|
-
|
-
|
|
Crawford 1991
|
Hamilton Oil
|
BHP
|
-
|
-
|
|
Piper Alpha 1988
|
Occidental
|
Talisman
|
-
|
-
|
|
Notification of disused pipelines
During the course of a field's life, pipelines/sections of
pipelines may be taken out of use, e.g. due to corrosion,
problems with reservoir pressure, damage to the pipeline, etc.
When this happens, under the Petroleum Act 1998 the Secretary of
State has the option of immediately calling for a full
decommissioning programme. This is not always considered an
appropriate option however, and so it has been agreed
consideration will be given to handling suitable pipelines, under
an informal decommissioning regime, thereby deferring a formal
programme until the end of the field's life.
If a formal decommissioning programme is not immediately deemed
suitable, details of the out of use pipeline(s) will be
circulated to other government departments for comment. Following
this,
OPRED will decide one of the following:
- we are content with the proposals for monitoring and
maintaining the out-of-use pipeline
- we request additional information or further remedial action
- we request a formal decommissioning programme
The Interim Pipeline Regime is intended to ensure out of use
lines do not pose a risk to other users of the sea or the
environment and that they are covered by an appropriate surveying
and maintenance regime from the point when they are taken out of
use until approval of the formal decommissioning programme, which
is usually at the end of field life. It should be noted that any
interim solution should not prejudice the final decommissioning
options for that line, including complete removal. The department
expects operators to submit details of out of use
pipelines/sections of a pipeline as soon as they are taken out of
use.
Operators are reminded that any works that are proposed on any
pipelines under the Pipeline Works Authorisation regime, as per
their Terms and Conditions of the PWA, must have a legal
consent in place before works can commence which includes but is
not exclusive to any proposed decommissioning works. Consents are
issued by the North Sea Transition Authority (NSTA) and operators
are requested to email consents@nstauthority.co.uk
on any queries that they may have relating to legal consents.
Further guidance can also be found on the NSTA
website.
Once the necessary legal consent has been issued by NSTA,
Consents & Authorisations Section, Operators are to email a
completed IPR1 Form (MS Word
Document, 63.7 KB) to odu@energysecurity.gov.uk.
If you are an operator, aware of any out of use pipelines that
have not been referred to the department, please submit a
completed IPR1 Form at your earliest convenience.
Following confirmation a pipeline has been accepted under the
Interim Pipeline Regime, the Offshore Decommissioning Unit will
continue to monitor the condition of the pipeline by asking the
Operator to confirm the status of the pipeline remains unchanged
following future surveys at an agreed frequency. If you are an
operator who wishes to request a change to the agreed frequency
of surveys following acceptance of a pipeline into the IPR,
please submit a completed IPR2 Form (MS Word
Document, 53.4 KB) to odu@energysecurity.gov.uk.
Please note that a recent survey (done that year) must have been
completed before any change of survey frequency will be
considered.
Further information
A list of all installations on the UKCS and their current status is
available from the
OSPAR Website
At the first ministerial meeting of the Commission for the
Protection of the Marine Environment of the North East Atlantic
(OSPAR)
in 1998, a binding decision was agreed that set rules for the
disposal of offshore installations at sea. Under the decision the
dumping and leaving wholly or partly in place of offshore
installations is prohibited. Decision 98/3 recognises it may be
difficult to remove the ‘footings' of large steel jackets
weighing more than 10,000 and concrete installations. As a result
there are derogations for these categories of installations if
the internationally agreed assessment and consultation process
shows leaving them in place is justifiable.
OPRED has utilised decommissioning programme templates for
derogation and non-derogation projects. These templates include
all required content as detailed in Annex C of the guidance
notes. There are also templates available which are currently
being trialled for more specific and small scale decommissioning
activity including rig reactivation and removal of a single
Wellhead Protection Structure. Operator's should discuss all
individual cases with
OPRED who will advise of the appropriate template.
A Standard Decommissioning
Programme Template (Non-Derogation Cases)(PDF, 608 KB, 33 pages) is
available - (March 2025).
A Standard Decommissioning
Programme Template (Derogation Cases) (PDF, 1.11 MB, 37 pages) is also
available (November 2018).
A word version of these templates can also be requested from
OPRED. Please email odu@energysecurity.gov.uk
for further details.
Cost recovery
OPRED will charge a fee in respect of offshore (oil and
gas) installations and pipelines decommissioning programmes under
the Petroleum Act 1998. Guidance, including the indicative fee
structure, is available in Guidance on charging a fee
for offshore (oil and gas) installations and pipelines under the
Petroleum Act 1998 (PDF, 308 KB, 9 pages)
|