Mandatory full fibre broadband for all new build homes and
a new priority to connect hard-to-reach rural areas are key
measures proposed in a national, long-term strategy for UK
telecommunications.
The new approach is aimed at driving large-scale commercial
investment in the fixed and wireless networks that are
vital for the UK to remain globally competitive in a
digital world.
The Future Telecoms
Infrastructure Review (FTIR), announced as part of
the government’s modern Industrial Strategy, proposes the
changes that are needed to give the majority of the
population access to 5G, connect 15 million premises to
full fibre broadband by 2025, and provide full fibre
broadband coverage across all of the UK by 2033. Full fibre
infrastructure is vital to underpin 5G coverage.
At its heart is an emphasis on greater consumer choice and
initiatives to promote quicker rollout and an eventual full
switch over from copper to fibre.
DCMS Secretary of State, said:
We want everyone in the UK to benefit from world-class
connectivity no matter where they live, work or travel.
This radical new blueprint for the future of
telecommunications in this country will increase
competition and investment in full fibre broadband,
create more commercial opportunities and make it easier
and cheaper to roll out infrastructure for 5G.
The FTIR’s analysis indicates that, without change, full
fibre broadband networks will at best only ever reach three
quarters of the country, and it would take more than twenty
years to do so. It also indicates that 5G offers the
potential for an expansion of the telecoms market, with
opportunities for existing players and new entrants.
Key recommendations from the FTIR include:
- New legislation that will guarantee full fibre
connections to new build developments;
- Providing Operators with a ‘right to entry’ to flats,
business parks, office blocks and other tenanted properties
to allow those who rent to receive fast, reliable
connectivity, from the right supplier at the best price;
- Reforms to the regulatory environment for full fibre
broadband that will drive investment and competition and is
tailored to different local market conditions;
- Public investment in full fibre for rural areas to
begin simultaneously with commercial investment in urban
locations;
- An industry led switchover (from copper to full fibre)
coordinated with Ofcom;
- A new nationwide framework which will reduce the costs,
time and disruption caused by street-works by standardising
the approach across the country;
- Increased access to spectrum for innovative 5G services
- Infrastructure (including pipes and sewers) owned by
other utilities such as power, gas and water, should be
easy to access, and available for both fixed and mobile
use;
- Ofcom to reform regulation, allowing unrestricted
access to Openreach ducts and poles for both residential
and business use, including essential mobile
infrastructure;
- Alongside the FTIR, Government has also published a
Digital Infrastructure Toolkit which will allow mobile
networks to make far greater use of Government buildings to
boost coverage across the UK.
The FTIR will drive competition and commercial investment
in full fibre networks across as much of the UK as
possible. However there will be some parts of the country
where it will be unlikely that that the market will be able
to deliver alone.
Nationwide availability of full fibre is likely to require
additional funding of around £3 billion to £5 billion to
support commercial investment in the final c.10% of areas.
These, often rural areas, must not be forced to wait until
the rest of the country has connectivity before they can
access gigabit-capable networks.
The Government will therefore pursue an “outside-in”
strategy, meaning that while network competition serves the
commercially viable areas, the Government will support
investment in the most difficult to reach areas at the same
time. We have already identified around £200 million within
the existing Superfast broadband programme that can further
the delivery of full fibre networks immediately.
Sharon White, Ofcom Chief Executive, said:
We welcome the Government’s review, and share its
ambition for full-fibre and 5G networks to be rolled out
right across the UK. The Government and Ofcom are working
together, and with industry, to help ensure people and
businesses get the broadband and mobile they need for the
21st century.
Next steps
We will shortly publish consultations on legislative
changes to streamline wayleaves and mandate fibre
connections in new builds. The conclusions of the Review
will also form the basis of the government’s Statement of
Strategic Priorities (SSP) to Ofcom, setting out the
strategic objectives and outcomes that the regulator must
have regard to in the exercise of its regulatory functions.
Notes to Editors
- The UK has only 4% full fibre connections and lags
behind many of our key competitors Spain (71%), Portugal
(89%) France (c.28% and increasing quickly).
- Full fibre networks are faster, more reliable, and more
affordable to operate than than copper-based networks. 5G
will deliver faster and better mobile broadband, and enable
new applications in industry sectors like manufacturing,
health and transport.
- The strategy seeks to recognise differences across
rural and urban areas, and develops solutions that are
tailored to both. The Review concludes that the best
approach is to promote competition and commercial
investment wherever possible, and to intervene only where
necessary.
- Market competition should deliver full fibre networks
across the majority of the UK if we get the conditions
right (c.80%). c.20% of the country is likely to require
bespoke solutions to ensure rollout of networks. 5G is not
just about faster mobile data connections, it could also
deliver a wide range of new opportunities across industry
sectors such as manufacturing, energy, transport and
healthcare. The Government wants to encourage these new
commercial opportunities through policy reforms, including
making sure spectrum is accessible to all and used
efficiently.
- Running copper and fibre networks in parallel is both
costly and inefficient, and a ‘fibre switchover’ strategy
will be necessary to stimulate demand for fibre, to enable
new networks to achieve scale quicker, and to ensure a
smooth transition process for customers. The switchover
process will be industry-led and timing will be dependent
on the pace of rollout of fibre networks, and on the
take-up of those networks. It is realistic to assume that
switchover could happen in the majority of the country by
2030, but the timing will ultimately be dependent on the
pace of fibre roll out and on the subsequent take-up of
fibre products.
- The EU’s new directive for electronic communications –
the European Electronic Communications Code (EECC) - is
currently under negotiation. It is likely to be adopted by
the EU shortly. If adopted, we are minded to implement,
where appropriate, the substantive provisions in UK law, on
the basis that it would support UK’s domestic policy
objectives. This will enable the extension of market review
periods to five years and provide mechanisms to aid fibre
network rollout in certain areas.